My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-126 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2006
>
2006-126 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 3:52:33 PM
Creation date
1/10/2014 9:52:03 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2006-126
Legislation Date
6/21/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.2 CommunityMeeting <br />A final public meeting will be convened to solicit communiry input on the provisions of the <br />Draft Plan and implementation process. <br />3.3 Fina1 Plan Documents <br />The UDC will prepare final plan documents, incorporating any necessary changes resulting <br />from the Community Meeting and Steering Committee review of the draft documents. The <br />final products of the study will include: <br />Illustrative Plan: a large scale color graphic summary of the design concepts for the <br />corridor, and ten (10) reduced copies, suitable for easy reproduction and wider <br />distribution as needed. <br />Plan Report: summarizing the outcomes of the charrette and planning process, <br />provided in ten (10) bound color copies, and one unbound original suitable for easy <br />reproduction and wider distribution as needed. All text and gxaphics will also be <br />provided in digital format, as PDF files. <br />Staffing <br />The UDC employs a professional staff of seven full-time and three part-time planners and urban <br />designers. The Project Director for this study will be Terry Schwarz, Senior Planner, in <br />collaboration with Davrd Reed, Senior Urban Designer, and the multi-disciplinary staff of the <br />UDC. <br />Schedule <br />The attached Proposed Project Schedule outlines a 6-month process, extending from early June <br />to the end of October, 2006. <br />Budget <br />The UDC will complete the work program outlined above for $12,000, including all required <br />graphic supplies and reproduction costs. <br />If this work program, schedule and budget is acceptable, please sign and return one copy of this <br />proposal which will serve as a contract agreement with the UDC for the professional services <br />outlined. <br />For the UDC: For the Ciry of North Olmsted: <br />Signed <br />Terry Schwarz, AICP <br />Senior 1'lanner Title. <br />Date: <br />4.
The URL can be used to link to this page
Your browser does not support the video tag.