My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-100 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1994
>
94-100 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 3:15:47 PM
Creation date
1/10/2014 3:23:19 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
94-100
Legislation Date
8/17/1994
Year
1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(b) The plan shall identify potential erosion and sediment <br />pollution problems and describe the measures to be taken to control <br />those problems. <br />(c) Provisions of the plan must satisfy all applicable requirements <br />of these rules. <br />(d) The plan must be submitted to and be approved by the City <br />Engineer prior to arry earth disturbing activity of the development area. <br />(e) The following information shall be included in the storm water <br />management and erosion and sediment control plan: <br />(1) A general project description including the nature <br />and purpose of the earth disturbing activity; <br />(2) A vicinity sketch locating the development area and all <br />pertinent surrounding features, including waters of the <br />state; <br />(3) An analysis of any impacted sensitive areas; <br />(4) The existing and proposed topography; <br />(5) The location and description of existing and proposed <br />drainage patterns and facilities, including any <br />pertinent drainage facilities beyond the development <br />area; <br />(6) The limits of earth disturbing activity; <br />(7) The types of soils within or affected by the development <br />area and the location of all highly erodible or unstable <br />soils; <br />(8) Erosion and sediment control practices to be employed on <br />the development area: <br />(A) Their location and, <br />(B) Where applicable, their size, detail drawing, <br />maintenance requirements, and design calculations; <br />(9) The schedule, phasing, and coordination of construction <br />operation and erosion and sediment control practices. <br />Page - 11 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.