My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-067 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1994
>
94-067 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 3:15:56 PM
Creation date
1/10/2014 5:03:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
94-067
Legislation Date
5/6/1994
Year
1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 <br />City of North Olmsted <br />Attn: Mr. Ralph Bohlmann, <br />Service Director <br />I. SCOPE OF SERVICES <br />A. Preparation of Contract Documents <br />March 11, 1994 <br />The W.R.E.S. Corporation (a.k.a. The Western Reserve Engineering and Surveying <br />Company) will prepare construction plans and specifications necessary for the replacement of <br />the pavement on Douglas Drive, Alden Drive, Willet Drive, Dewey Road and Sweetbriaz Drive <br />(East half). Proposed work will generally consist of complete pavement replacement with <br />reinforced concrete pavement with integral curbs. Work shall also include subbase, underdrains, <br />electric conduit for street lighting, catch basins and drive apron replacement. New storm sewers <br />will be installed on Dewey, Sweetbriar and the portion of Douglas Drive between Evergreen <br />Drive and West Park Drive. <br />Construction documents and engineering design parameters will be in accordance with <br />the latest North Olmsted City Standards. <br />Construction documents will include a title sheet, general notes, typical sections, plan <br />sheets and miscellaneous detail sheets. Construction plan design will incorporate all normal <br />engineering considerations for a project of this type. <br />Drawings shall be prepared using Autocad Version 12. <br />The horizontal alignment will not be revised as part of this project. <br />The vertical alignment of the roadway will be changed in one of two ways for those <br />streets which will have new storm sewers: <br />1) Lower the roadway grade to allow for positive drainage from the sidewalk <br />to the new vertical curb. This may require the waterline to be replaced <br />due to inadequate cover. <br />2) Maintain the existing roadway grade and install yard basins in each <br />treelawn. <br />Plans, specifications and construction cost estimates shall be prepared the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.