Laserfiche WebLink
~~ <br />Page 3 <br />City of North Olmsted <br />Attn: Mr. Ralph Bohlmann, <br />Service Director <br />March 11, 1994 <br />All above ground features and existing underground utilities within and adjacent to the <br />right-of--way shall be shown on the plans. All utility companies involved will be notified of the <br />project. <br />B. Surveying Services <br />The W.R.E.S. Corporation will perform all field surveys necessary to develop the final <br />construction plans and specifications. <br />C. Construction Services <br />This project will be administered by the City of North Olmsted. The W.R.E.S. <br />Corporation will be available to provide consultation services during construction to interpret <br />plan intent and answer any pertinent questions. <br />II. TIME SCHEDULE <br />Construction plans will be completed within sixteen (16) weeks of authorization to <br />proceed. <br />III. FEE SCHEDULE <br />We propose a fee for the above basic services of Forty Five Thousand Dollars <br />($45,000.00). <br />The Fee for any waterline replacement work will be negotiated if the work is required. <br />