Laserfiche WebLink
<br /> <br />Page 4 <br />City of North Olmsted <br />Attn: Mr. Ralph Bohlmann, <br />Service Director <br />IV. SUPPLEMENTARY SERVICES AND CHARGES <br />March 11, 1994 <br />Not included in the fee for basic services are various supplementary services. These <br />supplementary services vary greatly in scope, complexity and timing. They may be a prominent <br />part of some engineering projects and not exist with others. Such supplementary services when <br />performed by the Engineer shall be paid at our prevailing per diem rates. When performed by <br />others, the charge will be at 1.1 times the actual cost to cover overhead. <br />1. Calculation of special assessments. <br />2. Procuring permits, easements or rights-of--way. <br />3. Additional services resulting from significant changes in the general scope of <br />design of the project. <br />4. Preparing for public hearing or attendance. <br />5. Specialized traffic studies. <br />6. Environmental impact statements. <br />7. Cost of test borings or other sub-surface explorations if not included in the Fee <br />Schedule. <br />8. Field surveys for construction staking. <br />9. Resident Engineer. <br />10. Construction Observer. <br />11. Shop, mill, field or laboratory inspection of materials. <br />12. Preparation of "as built" drawings. <br /> <br />13. Attendance at pre-construction or construction meetings. <br />