Laserfiche WebLink
-3- <br />lighting, reconstructing water mains and water service connections where necessary, <br />reconstructing storm sewers where necessary, and constructing and reconstructing catch basins <br />where necessary in Coe Avenue; (ix) grading, draining, curbing, reconstructing the pavement <br />base, widening, preparing the surface and paving with concrete, constructing storm sewers and <br />catch basins, reconstructing sidewalks and driveway aprons, installing underground and <br />above-ground wires and cables for street lighting, reconstructing water mains and water service <br />connections where necessary, and reconstructing and rehabilitating sanitary sewers and sanitary <br />sewer service connections where necessary in Park Lane, Ambour Drive and Beech Lane; (x) <br />grading, draining, curbing, reconstructing the pavement base, preparing the surface and paving <br />with concrete, reconstructing driveway aprons, constructing and reconstructing catch basins, <br />installing underground and above-ground wires and cables for street lighting, reconstructing <br />water mains, water service connections and sidewalks where necessary, and reconstructing and <br />rehabilitating sanitary sewers, sanitary sewer service connections and storm sewers where <br />necessary in Noreen Drive, Palm Drive and Birch Lane; (xi) grading, draining, curbing, <br />reconstructing the pavement base, preparing the surface and paving with concrete, constructing <br />and reconstructing catch basins, installing above-ground wires and cables for street lighting, <br />reconstructing water mains, water service connections, storm sewers, sidewalks and driveway <br />aprons where necessary, and reconstructing and rehabilitating sanitary sewers and sanitary sewer <br />service connections where necessary in Hawkins Road; (xii) grading, draining, curbing, <br />reconstructing the pavement base, widening, preparing the surface and paving with concrete, <br />constructing storm sewers, catch basins, sidewalks and driveway aprons, installing underground <br />and above-ground wires and cables for street lighting, reconstructing water mains and water <br />service connections where necessary, and reconstructing and rehabilitating sanitary sewers and <br />sanitary sewer service connections where necessary in Esther Avenue; (xiii) grading, <br />reconstructing the pavement base, widening, paving with asphalt, constructing and reconstructing <br />storm sewers and catch basins, reconstructing and rehabilitating sanitary sewers and sanitary <br />sewer service connections where necessary, and reconstructing sidewalks and driveway aprons <br />where necessary in Alexander Road; (xiv) grading, draining, curbing, reconstructing the <br />pavement base, preparing the surface and paving with concrete, constructing and reconstructing <br />storm sewers and catch basins, reconstructing sidewalks and driveway aprons, installing <br />underground and above-ground wires and cables for street lighting, reconstructing water mains <br />and water service connections where necessary, and reconstructing and rehabilitating sanitary <br />sewers and sanitary sewer service connections where necessary in Westchester Drive; <br />(xv) grading, draining, curbing, reconstructing the pavement base, preparing the surface and <br />paving with concrete, constructing and reconstructing storm sewers and catch basins, <br />reconstructing sidewalks and driveway aprons, installing underground and above-ground wires <br />and cable for street lighting, reconstructing water mains, water service connections and sanitary <br />sewer service connections where necessary, and reconstructing and rehabilitating sanitary sewers <br />where necessary in Olmsted Oval; (xvi) grading, draining, curbing, reconstructing the pavement <br />base, widening, preparing the surface and paving with concrete, constructing storm sewers and <br />catch basins, constructing and reconstructing sidewalks, reconstructing driveway aprons, <br />installing underground and above-ground wires and cables for street lighting, reconstructing <br />water mains, water service connections and sanitary sewer service connections where necessary, <br />and reconstructing and rehabilitating sanitary sewers where necessary in Macbeth Avenue; and <br />