Laserfiche WebLink
(k)~ Fire Damage Restoration <br />(1) 1st $25,000 in restoration cost ..................................................:........................ $8 . <br />0 00 <br />(2) For each additional $1,000 thereafter....: .............:.....:.................. ....................... $1. <br />00 <br />(I) Reconstruct Foundation Walls .....................................................................:..............:....... $80.00 <br />(m) Demolition of Buildings or Structures <br />(1) Up to 3000 sq ft .......................:....................................................:................. $85.00 <br />(2) For each 5000 sq ft in excess of the first 3000 sq ft ................................................. $8.50 <br />(3) All accessory structures ..................................................................................... $20.00 <br />(n) Moving of Buildings or Structures <br />(1) On or across public thoroughfare ........................................................................ $800.00 <br />(2} From one lotto another without moving on a public thoroughfare., .........................:.. $200.00 <br />(o) Outdoor Signs and Display Structures <br />(1) Up to 50 sq ft .................................................................................................. $8 . <br />5 00 <br />(2) For each 10 sq ft over 50 sq ft .............................................:.............................. $3.50 <br />(p) Fences <br />The erection, construction, alteration, and installation of fences within the city shall be in accordance with <br />the provisions of the Codified Ordinances and shall require the obtaining of a permit and the submission of <br />of plans for such proposed fence. <br />(1) Residential ..................................................................................................... <br />5 00 <br />$2 . <br />(2) Commercial (for the first 200 ft) ......................................................................... $4 .00 <br />0 <br />_: (a) For each additional 100 ft after the first 200 ft ................................................... $5:00 <br />(q) Permanent-Type Swimming Pool or Any Other Artificially Created Body of Water <br />(1) Up to three (3) inspections ...........................................................:................... $75.00 <br />(2) For each additional inspection over the first 3 ........................................................ $25.00 <br />(r) Tower (Residential) <br />(1) Initial Fee ....................................................................................................... $60.00 <br />(s) Dish-Type Satellite Signal Receiving Earth Stations <br />(1) Residential ..................................................................................................... $155.00 <br />(2) -Commercial .................................................................................................. $185.00 <br />(3) Plan Exam Commercial (when necessary) .........................................:.................. .$70.00 <br />(t) Modular or Industrialized Units... ...................................................................................... $100.00 <br />(u) Examination of Plans <br />(1) Initial fee with more than three dwelling units and industrial only ................................ $1.30.00 <br />(a) .Also per 100 sq ft ....................................................................................... $3.50 <br />(2) Review of rejected plans per occurrence ....................................................:.......... + 50% <br />(3) Review of incomplete plans .............:...........................:..................................... + 25% <br />(4) Review of shop drawings (fire alarm, sprinklers, HVAC etc.) not submitted as part <br />of the original documents .............................................................................. $100.00 <br />(a) Also per 100 sq ft ..............:......................................................................... $2.75 <br />(5) Review of changes submitted after permit is issued ................................................ $35.00 <br />(6) Residential new homes only (no charge for same as) .............................................. $75.00 <br />(v) Homeowners' Blanket Permits -Alterations; Single Family Dwellings <br />Any and all interior alterations done to a structure by a residing owner whereby the valuation over a 12 <br />month period does not exceed $5,000 (Plumbing, Electrical, and Heating permits may be included) $40.00 <br />(w) Installation of Commercial Compactor ................................................................................ $50.00 <br />(x) Free Standing Fireplace or Heating Unit .............................................................................. $40.00 <br />(y) Fire Sprinkler System <br />(1) Standard System -first 20 heads .................................:............................... $50.00 <br />(2) Each additional head after the first 20 ..:............................................................... $1.00 <br />(z) Chemical Suppression Svstem .......................................................................................... $50.00 <br />(aa) Standpipe Without Sprinkler Svstem .................................................................................. $50.00 <br />(bb) Gas Piping <br />(1) The base feee for any. permit to install gas piping shall be ........................................ $30.00- <br />(2) Per outlet ....................................................................................................... $3.50 <br />(NOTE: Although not part of the ordinances of the City of North Olmsted, a three percent (3%) <br />surcharge is required to be assessed, by the State of Ohio, to all commercial permits governed by the <br />Oh10 BUllding Code. shared/bldg/fee schedules/General Bldg Fee Schedule-2002 <br />