Laserfiche WebLink
r • •` <br />1321.01 General Building Fees; Contractor Registration <br />The following permit and inspection fee schedule is authorized to be charged and collected by the <br />Building Commissioner, in the amount provided for in each of the following years: <br />(a) Registration/Licensing of Contractors <br /> Reference is made to Section 1317.08 <br /> (1) General licensing fee ............................................................................... ..... $150.00 <br /> (2) General licensing fee renewal (up to 30 days after expiration date) .................... ........ $75.00 <br /> (3) Registration fee ...................................................................................... ........ $100.00 <br /> (4) Registration fee renewal (up to 30 days after expiration date) ........................... ........ $50.00 <br />(b) Residential Buildings; New Construction <br /> (1)One-family house shall be the higher of the following <br /> (a) Initial fee plus .................................................................................... ......... $126.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area ......................................................................... ........ $9.00 <br /> (b) Per $1,000 of the construction cost ........................................................ ...... 0.003 <br /> (2) Two-family house shall be the higher of the following: <br /> (a) Initial fee plus per dwelling .................................................................... ......... $126.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area .......................................................................... ......... $9.00 <br /> (b) Per $1,000 of the construction cost ........................................................ ........ 0.003 <br /> (3) Apartments houses containing more than two dwelling units <br /> shall be the higher of the following: <br /> (a) Initial fee plus per dwelling ................................................................... ......... $84.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area ........................................................................... ........ $9.00 <br /> (b) Per $1,000 of the construction cost ........................................................ ........ 0.003 <br />(c) Residential Buildings, Additions <br /> (1) Initial fee plus the higher of the following ...................................................... ........ $42.00 <br /> (a) Also usable floor area fee per 100 sq ft in all stories .................................. ........ $5.00 <br /> (b) Per $1,000 of the construction cost ........................................................ ........ 0.003 <br />(d) Residential Buildings - Accessory Detached Garages & Accessory Structures <br /> (1) Initial fee over 200 sq ft ............................................................................ ........ $45.00 <br /> (2) Also per 100 sq ft floor area ....................................................................... ........ $2.00 <br />(e) Residential Buildings, Alterations Other Than Additions <br /> (1) Initial Fee ............................................................................................... ........ $42.00 <br /> (2) Also for each $1,000 evaluation in excess of first $2,000 ................................. ........ $5.00 <br />(f) Replacement of Roofing, Siding, Windows, House Painting <br /> (1) Initial Fee ............................................................................. ... ............... ........ $42.00 <br /> (2) Also per 1,000 sq ft. in excess of the first 1000 sq ft ....................................... ......... $5.00 <br />(g) New Driveways (Asphalt and Concrete) and Patio (in excess of 100 sg ft~ <br /> (1) Initial Fee ............................................................................................... ........ $50.00 <br /> (2) Also per 1,000 sq ft. in excess of the first 1000 sq ft ....................................... ......... $5.00 <br />(h) Business or Industrial Building New <br /> Shall be higher of the following: <br /> (1) Initial Fee Plus ........................................................................................ ......... $850.00 <br /> (a) Per 100 square feet of floor area ........................................................... ........ $10.00 <br /> (2) Per $1,000 of the construction cost .............................................................. ..... 0.003 <br />(i) Business or Industrial Building Appurtenances Additions and Alterations <br /> (1) Initial Fee, plus the higher of the following: $150.00 <br /> (a) Per 100 square feet of floor area ........................................................... ........ $10.00 <br /> (b) Per $1,000 of the construction cost ........................................................ ........ 0.003 <br />(j) Accessory Sturcture (sheds gazebo greehouse cabana arbor etch <br />(1) Not in excess of 200 sq ft .................................................................................. $50.00 <br />EXHIBIT <br />