Laserfiche WebLink
CITY OF NORTH OLMSTED <br />ORDINANCE NO. 2010 - 153 <br />BY: Mayor Kennedy <br />AN ORDINANCE DISPENSING WITH A FORMAL RFP PROCESS AND <br />A UTHORIZING THE MA YOR TO ENTER INTO A CONTRACT WITH <br />HAZEN AND SAWYER, P.C. TO PROVIDE CONTINUED <br />ENGINEERING DESIGN AND OTHER RELATED PROFESSIONAL <br />SERVICES TO THE CITY OF NORTH OLMSTED IN CONNECTION <br />WITH PROPOSED IMPROVEMENTS TO THE WASTEWATER <br />TREATMENT PLANT AND COLLECTIONS SYSTEM, AND <br />DECLARING AN EMERGENCY. <br />WHEREAS, this Council on November 15, 2005, adopted Ordinance No. 2005-167 <br />authorizing the Director of Public Service to request proposals from qualifying consulting <br />engineer firms to conduct a rate and operations study of the North Olmsted Wastewater <br />Treatment Plant and Collections System; and <br />WHEREAS, proposals were thereafter submitted by various consulting engineering <br />firms and, on July 25, 2006, the City's Board of Control awarded a contract to ATS <br />Engineering, Inc., as the firm most qualified to conduct the rate and operations study for the <br />City; and <br />WHEREAS, in the years 2006-2007, ATS Engineering, Inc. comprehensively studied <br />and reviewed the rate structure and operations of the Wastewater Treatment Plant and <br />Collections System, and, on September 12, 2007, presented to this City Council its formal <br />report which recommended an increase in user charges, plant operational changes, and <br />various improvements to the Wastewater Treatment Plant and Collections System; and <br />WHEREAS, based on the recommendations of the Administration and ATS <br />Engineering, Inc., this Council, on November 20, 2007, adopted Ordinance No. 2007-123, <br />which provided for an increase in user charges effective January l, 2008; and <br />WHEREAS, the City via 2008-9 authorized additional consulting engineer firm <br />services with ATS Engineering, Inc. in order to provide engineering design and other related <br />professional services to the City in connection with the above referenced proposed <br />improvements to the Wastewater Treatment Plant and Collections System; and <br />WHEREAS, on the 8t" day of April, 2009, the Corrected Copy of the Agreement <br />authorized by 2008-9 was entered into with ATS Engineering, Inc., a copy of which is <br />attached hereto as Exhibit A; and <br />WHEREAS, since April of 2009, Hazen and Sawyer, P.C. is the assignee / successor <br />entity to ATS Engineering, Inc.; and <br />WHEREAS, the City is in need of additional / continued engineering design services <br />with Hazen and Sawyer, P.C., as the work upon the proposed renovations to the Waste Water <br />Treatment Plant and Collection Systems continues; and