Laserfiche WebLink
~~ - a <br />APPENDIX A <br />SANITARY SEWER PLAN OF STUDY PHASE II <br />Description of Project <br />The project consists of Engineering Services for the City of North Olmsted to provide <br />recommendations and pricing for the most cost effective and highest impact solutions for <br />resolving problems with conveyance of storm water and wastewater during wet weather <br />events. The major goal is to eliminate the need for bypassing of pump stations and <br />manually transferring commingled storm and wastewater from the sanitary sewer system <br />into the storm sewer system to prevent residential basement flooding during wet weather <br />events. <br />The Engineering Firm selected will utilize the information assembled in the Plan of <br />Study Phase I Report. The Executive Summary defines the areas of concern and <br />provides potential solutions for the resolution of issues in those areas. The Engineering <br />Firm will not be restricted to only using the Phase I suggested solutions but can propose <br />alternative solutions or synthesized solutions (i.e. Phase I solutions with improvement <br />modifications). The idea is not to limit but to utilize the observations already made anti <br />arrive at proposals that can be realistically accomplished both physically and financially. <br />A preliminary time line has been provided in the Work Plan contained in the Phase I <br />Report. This should be used as a basis for keeping the project(s) on track in order to <br />provide Ohio EPA results that action is being taken to resolve this issue. <br />