My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75-218 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1975
>
75-218 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2014 3:00:39 PM
Creation date
1/14/2014 6:49:14 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
75-218
Legislation Date
11/5/1975
Year
1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />1129.03 Issuance of Certificate of Occupancy or Conditional <br />Certificate of Occupancy if Building Permit Is Issued <br />(Amended 10-7-69 - Ord. b8-100) <br />A Certificate of Occupancy or Conditional Certificate of <br />Occupancy, either for the whole or a part of a new building, a <br />building which has been moved, or for alteration of an existing <br />building, shall be issued within 30 (thirty) days after the <br />erection or alteration of an existing building, shall be issued <br />within 30 (thirty} days aftex the erection or alteration of <br />such building or part shall have been completed in conformity <br />with the building permit. <br />1129.04 Application Fox Certificate of Occupancy If <br />No Building Permit Required <br />In the event the owner or occupant of vacant land desires <br />to use or occupy same or change the use of the same, or in the <br />event the owner or occupant of an existing building desires to <br />change the use of the same, he shall file with the Building <br />Official an application for a Certificate of Occupancy which <br />shall set forth a description of the land, the buildings <br />if any, the present use and the proposed new use. <br />1129.05 Issuance of Certificate of Occupancy or Conditional <br />Certificate_of Occupancy If No Building Permit <br />Required (Amended 10-7-69 - Ord. 68-100) <br />A Certificate of Occupancy, or Conditional Certificate <br />of Occupancy applied for as required by Section 1129.04, shall <br />be issued before any land shall be occupied or used, or the <br />use of such land or building changed. Such certificate shall <br />be issued within ten (10} days after the applicationYas been <br />made, provided such proposed use is in conformity with the <br />provisions of the Zoning Code. <br />- 18 - <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.