DECEIVER 17, 1957
<br />MINUTES OF A MEETING OF THE COUNCIL OF THE CITY OF
<br />NORTH OLMSTED, OHIO
<br />Present were Dr. Lewis, Mayor; Robert L. Decker, President of Council; L. H.
<br />Baker, Harry M. Crider, Wm. H. Kramer, Bruce i~ia.cDonald, Ralph G. Neubauer,
<br />Geo. Porter IIT, and James F. Votava, Safety-Service Director, G. H. Schwenk
<br />was absent.
<br />Also present were F. G. Kitson, Solicitor; E. M. Christman, Clerk; and Everett
<br />Dean, Engineer.
<br />Moved by Mr. Neubauer, seconded by Mr. Kramer, that the minutes of December 3rd
<br />be approved as read, "Yeas~~ Baker, Crider, Kramer, Neubauer, Porter,
<br />The Safety-Service Director appointed Mr. Levi Morse, School Guard, to replace
<br />Andrew Wood, effective December 20th, 1957. It was moved by Mr. Neubauer,
<br />seconded by Mr, Kramer, the above appointment be approved. 'Yeas" Baker,
<br />Crider, Kramer, Neubauer, Porter.
<br />A communication was read from the Planning Commission recommending acceptance
<br />of subdivisions No. 3 and 4 of Ohio Shores Construction Corporation, for
<br />recording purposes only, providing a cul-de-sac is shown on the end of Ambour
<br />Drive on subdivision No. 3, and provided a deposit of one and one-half (l~) of
<br />the estimated cost of sewer and water installations for inspection of work,
<br />and also provided cost estimates and approval of the sewer and water systems
<br />is given by the City Engineer,
<br />The Engineer reported the plans had been submitted and gave the following report:
<br />"Water Plan Approved
<br />Estimate Subdivision No. 2 & 3 .6,364,00
<br />Estimate " No. 4 7,274.20
<br />Storm sewer approved subject to increase in size of culvert crossing
<br />Ambour Drive at Station 19+72 to conform to recommendation of Floyd
<br />G. Browne and Associates in their Sewerage Report (Plate 11) dated
<br />September 1957.
<br />Estimate Subdivision No. 2 and 3 .~5,$H4.55
<br />Estimate Subdivision No. 4 .11,659.75
<br />Paving plan calls for 20 foot reinforced concrete without curbs.
<br />This same type was approved and installed in Subdivision No. 1 and
<br />approved for Subdivision No. 2,
<br />This does not conform to Ordinance on Subdivision Improvements.
<br />Estimate Subdivision No. 2 ~C 3 x.4,000.00
<br />Estimate Subdivision No. 4 16,000,00
<br />No plans were submitted for concrete walk.
<br />Estimate Subdivision No. 2 & 3 x+3,300.00
<br />Estimate Subdivision No. !~ 4,000.00
<br />Plans for storm sewers should be revised to meet increased size of
<br />culvert at Station 19+72, also plans completed and submitted for walks
<br />before acceptance.i~
<br />Signed: Everett N. Dean, Assistant Engineer
<br />A communication was read from the Planning Commission recommending the accept-
<br />ance of the plat of Mr. Alexander Steve for the Barton Road Subdivision,
<br />consisting of six lots, for recording purposes only,
<br />Mr. Kramer reported the Finance Committee met with the Safety Committee and
<br />it was recommended an increase of 5~ in salaries for Firemen and Policemen
<br />be given, and Volunteer Firemen salaries be increased from X4.00 to X5.00
<br />for night men. The raise is to become effective January 1, 1958.
<br />Mr. Porter, Chairman of the Safety Committee, reported that Police and Firemen
<br />had requested a 15~ increase in March and were given 6~, and are now asking
<br />10~ and the Committee recommended 5~, making an increased expenditure of
<br />approximately X6,500.00 per year.
<br />Mr. Neubauer reported Decker Road lighting is on the plans to be completed
<br />by December 13th, along with several other streets. This will bring the total
<br />to 508 lights installed.