Laserfiche WebLink
MINUTES OF THE MEETING OF THE COUNCIL <br />OF THE CITY OF NORTH OLMSTED <br />SEPTEMBER 16, 2003 <br />Present: President of Council O'Grady, Council Members Dailey, Gareau, Kasler, <br />Limpert, McKay, Miller, Nashar <br />Also Present: Mayor Musial, Law Director Dubelko, Finance Director Copfer, Clerk of <br />Council Seman <br />President O'Grady called the meeting to order at 8:05 p.m. in Council Chambers, 5200 <br />Dover Center Road, North Olmsted, Ohio <br />The audience was invited to join Council in the recitation of the Pledge of Allegiance. <br />The minutes of the Council meeting of September 2, 2003 were approved as written. <br />President O'Grady announced that Ordinance No. 2003-125 would be passed under <br />suspension of the rule. <br />REPORTS <br />Mayor Musial: 1) With regard to the Lorain Road rehab project, a second grinding crew <br />was put on the project. The grinding and laying down of the leveling asphalt coating <br />from Stearns Road to Canterbury Road should be completed by the end of the day this <br />Friday. On Saturday, weather permitting, traffic will be returned to one lane each <br />direction with a turning lane for the entire length of the project. Additionally, a second <br />concrete crew has been put on to take care of the curb and apron installation. <br />Consequently, the productivity has been improved tremendously. <br />2) The library roofing is close to being completed. The slab grade is complete including <br />the plumbing and electrical installation underneath. The storm sewer system installation <br />has begun, and the wall stud installation has begun. <br />3) Sandy Ridge slab repair is done and lawn seeding has been done on Limpert and <br />Chapel Hill. With regards to North Park Estates, work is continuing on Camellia and <br />Nandina Drive and saw cutting has begun on Wisteria Drive and Andorra. <br />4) There is progress on the Bradley Road sidewalk project that had been stymied for a <br />short time period because the current concrete contractor has not been responsive to our <br />requests for information and proposals. Consequently, the Service Director is contacting <br />the contractor who did the slab repair in Sandy Ridge. Metroparks has confirmed that <br />they do have the project in their budget, so their portion of the project will be completed <br />in the near future. <br />5) The Engineering Department is preparing an application for the remainder of the <br />Lorain Road rehabilitation from north Canterbury to the Fairview Park city line. ODOT <br />has been contacted regarding their share of the cost of the project. <br /> <br />