My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/04/2006 Meeting Minutes
Document-Host
>
City North Olmsted
>
Minutes
>
2006
>
04/04/2006 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 8:50:00 AM
Creation date
1/6/2014 9:43:52 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Date
4/4/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Council Minutes of 4/4/06 <br />represent the citizens of this community and make things run smoothly. If that doesn't <br />happen, there could be a recall movement. <br />3) Susan Takacs, 27660 Lauren Lane, said she and her neighbors were at a recent <br />Council meeting to represent the Lauren Woods development to discuss the street <br />conditions that are deteriorating. They would like to know what is going to be done with <br />the streets of Lisa Lane and Lauren Lane. They attended a Council meeting in September <br />of 2002, and their streets were in need of repair at that time. Four years ago, the <br />neighbors were promised by the former mayor that their street was going to be put on the <br />list to be repaired after Forest Wood and Sandy Ridge, but that has not occurred. They <br />take pride in their neighborhood, in the condition of their houses, in their yards, and <br />would like to have the streets in the same condition as their property. <br />Mayor O'Grady said their request was very reasonable. The administration knows there <br />are many streets in the community that are in need of repair. This year, due to the major <br />construction projects that are being undertaken, (Claque Road and the eastern portion of <br />Lorain Road) the number of streets to be repaired has been limited. Next year we should <br />be back on a more reasonable schedule. At that point, it's the administration's intent to <br />have a rating of streets throughout the city. This rating will identify the streets that are in <br />most need of repair, and based on that rating suggestions will be made to Council on the <br />streets that ought to be at the top of the list. We will work our way through it. The <br />administration understands that poor streets affect the value of homes throughout the city. <br />His administration has changed the technique used in repairing road surfaces. The result <br />of that change is we will have long-lasting roads that are done at 1/5 the cost. That <br />means we can do roads five times faster, spending the same amount of money than we <br />were able to do in the past. The changes will take time. He is not in a position, nor <br />would he guarantee now that those streets are going to be on the list for next yeaz. He <br />will promise to prioritize the streets based on need and then take that recommendation <br />and forward it to Council. Service Director Limpert came forward and said everyone is <br />aware of the disparity between the number of streets that need repair and the amount of <br />money needed to do the repairs. The asphalt plant will won open, and some very serious <br />hot patch work will begin. A street assessment will be done this summer so that planning <br />can be done in the fall in order to provide a manageable list to Council for the 2007 <br />construction season. Councilman Miller noted that this development has been on the list <br />for street improvement, near the bottom, but included in a packet for street <br />improvements; it has been off the list; it has been almost on the list. But the development <br />has never quite been at the front of the list. He hopes, when the new list comes out, this <br />development is at or near the top. He requested the Streets & Transportation Committee <br />organize a street tour to look at those streets and others in the city. In the past, patching <br />has not held up during the winter freeze. There are also some problems with sinking <br />sewer grates. This area is in need of attention and hopes the hot patching will be of help <br />for this year. Councilman Gazeau noted that the city now has a cracker sealer which <br />should be of help when putting in the hot patch. Councilman Talton, who lives on <br />Lauren Lane, noted the street is approximately 37 years old and has never been <br />refinished. When you have a concrete roadway with normal daily traffic on it for 35 years <br />and no crack sealing, you've got a problem. Regarding the Mayor's statement about a <br />15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.