My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80-081 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1980
>
80-081 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 9:03:27 AM
Creation date
1/14/2014 10:25:58 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
80-081
Legislation Date
7/15/1980
Year
1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•. <br /> <br />CITY qF NQRTH OLMSTED <br />ORDINANCE N0. 80 - 81 <br />PAGE 5. <br />(3) For installation of electric whole <br />house baseboard heating .....................$20.00 Per House <br />(4) Other replacements than listed under this schedule: <br />(_a) Replacement of first unit ...............$10.00 <br />(b) Replacement of second or more units, <br />each ....................................$ 5.00 <br />(5) Thru-wall sealed combustion heaters, not <br />exceeding 100,000 BTU input, each unit......$ 8.00 <br />(a) Each additional unit ....................$ 4.00 <br />(b) Replacement of sealed combustion <br />appliance ...................... ........$ 4.00 <br />(6) Installation of domestic-type portable <br />incinerator not exceeding 2z cubic feet <br />combustion chamber volume ...................$ 5.50 <br />(7) Free standing fireplace and/or heating unit.$10.00 <br />(8) Energy vent type unit .......................$ 5.00 <br />(9) Solar heating ...............................$25.00 <br />(10) Heat Pump: <br />Residential .................................$20.00 <br />Commercial ..................................$30.00 <br />(E) For the installation of gas infrared units: <br />(1) Up to and including 50,000 BTU input <br />capacity ....................................$ 5.00 <br />(_2) Over 50,000 BTU input capacity ..............$ 8.00 <br />(F) Ventilation - Commercial: <br />(_1) Installation of each new exhaust system <br />for kitchen and cooking space, including <br />duct, hood and grease filters: <br />(.a) Installation of first system............$15.00 <br />(b) Installation of second or more systems, <br />each ....................................$ 7.00 <br />(.2) Replacement of exhaust fan, duct or hood, <br />including any required alteration incidental <br />thereto ... .................................$ 8.00 <br />for each additional unit ....................$ 4.00 <br />(3) Installation of ventilating or exhaust <br />systems independent of all other services <br />and systems in a building: <br />(a) Each system (.excluding toilet ventilation) <br />........................................$15.00 <br />(l~) For each additional system serving the <br />same building ...........................$ 8.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.