Laserfiche WebLink
.- 1. <br />. ~ ; <br />. '. <br />CITY OF NORTH. OLMSTED <br />ORDINANCE N0. 80- 81 <br />PAGE 6. <br />(G) Refrigeration and Summer Air Conditioning: <br />a <br />For each. new or altered air conditioning system <br />as per following rated capacity, except window <br />units: <br />(1) Each self-contained (single package) unit, <br />separate or combined with heating section <br />up to 36 MBH ..................................$ 8.00 <br />36 MBH to 120 MBH......1 ......................$10.00 <br />120 MBH and over ..............................$15.00 <br />(,2) Each unit with remote condensor (split <br />system): <br />Up to 36 MBH ..................................$10.00 <br />36 MBH. to 60 MBH ..............................$15.00 <br />60 MBH to 120 MBH .............................$18.00 <br />120 MBH to 200 MBH. ............................$25.00 <br />200 MBH and over ..............................$30.00 <br />Installation of ducts and other connecting <br />appurtenances: <br />(_1) For each $1,000 valuation or fraction thereof.$ 1.25 <br />(2) Minimum charge ................................$ 7.00 <br />Installation of refrigeration for storage or <br />processing of food and beverage coolers: <br />(.1) Installation of first unit ....................$ 7.00 <br />(2) Installation of second unit or more, each.....$ 3.00 <br />(H) Combination Heating and Cooling Units <br />(1) To be taken out as individual units...........Unit Charge <br />1321.04 ELECTRICAL LICENSE AND FEES. <br />The following fee schedule shall prevail for all electrical <br />work. to be performed: <br />~A) License. <br />Reference is made to the Regional Dwelling House Code <br />Section 1515.01 - "Registration, Licensing and Certificates <br />of Qualification - General Provisions". <br />(~.) Registration fee - Each Calendar Year.........$40.00 <br />~B) Work. to be performed: <br />(_1) Residential, new construction .................$30.00 <br />(2) Residential, additions or alterations: <br />(a) Minimum fee ...............................$ 7.00 <br />(h) Per outlet ................................$ .40 <br />(_c) From 4 kw, to 10 kw. capacity, per outlet.$ 1.25 <br />(_3) Commercial or industrial, new construction or <br />additions: <br />(a) Minimum fee ...............................$15.00 <br />(b) Also per receptable, unit, fixture or <br />outlet ....................................$ .50 <br />