My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-157 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-157 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:56:41 AM
Creation date
1/15/2014 8:03:36 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-157
Legislation Date
1/16/2002
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . ......:. . 6 .....,._ . :...._ . . ....... ... . . . . <br />. ...:.... ....4+. ..._......... . . . . . ....._ _ ...,...... ... _. _ < ... .. <br />CITY OF NORTH OLMSTED <br />RE50LUTION NO. 2001-157 <br />BY: MAYOR NORMAN T. MUSIAL <br />A RESOLUTION AUTHORIZING THE MAYOR TO DIItECTLY <br />PURCHASE A SECOND ROTATING ASSEMBLY FROM THE <br />ORIGINAL EQUIPMENT MANUFACTURER OF THE <br />EQITIPMENT INCORPORATED INTO THE 2000 DEWATERING <br />CENTRIFUGE PROJECT, AND DECLARING AN EMERGENCY <br />AS AMENDED. <br />WHEREAS, the City of North Olmsted completed the direct purcha.se of complete high <br />speed, high solids, solid bowl dewatering cemrifuge system in February 2001, and <br />WHEREAS, the City of North Olmsted awazded the Yard Piping and Sludge Loadout <br />Building (SLB) Modifications Contract in January 2001 and completed the construction of the <br />Yard Piping and Sludge Loadout Building (SLB) Modifications Contract in April 2001, and <br />WHEREAS, the City of North Olmsted completed the installation of the directly <br />purchased complete high speed, high solids, solid bowl dewatering centrifuge system inside the <br />modified Sludge Loadout Building in late April 2001, and <br />WHEREAS, the City of North Olmsted has successfully operated the purchased <br />complete high speed, high solids, solid bowl dewatering centrifuge system inside the modified <br />Sludge Loadout Building and, as a result, has achieved the expected operating cost reduction of <br />the North Olmsted Wastewater Treatment Plant since late Apri12001, and <br />WHEREAS, the City ofNorth Olmsted would be able to demolish the aged thermal <br />conditioning and vacuum filtration equipment after the delivery to the North Olmsted <br />Wastewater Treatment Plant of a second rotating assembly for directly purchased complete high <br />speed, high solids, solid bowl dewatering centrifuge system, and <br />WHEREAS, the City of North Olmsted will be able to realize the recovery of <br />approximately $3 million of existing structures at the North Olmsted Wastewater Treatment <br />Piant by beginning the renovating the existing Low Pressure Oxidation No. 1 Building and the <br />existing Low Pressure Oxidation No. 2 Building for other plant maintenance, plant laboratory <br />and Systems operations after the demolition the aged thermal conditioning and vacuum filtration <br />equipment to assist the City of North Olmsted in maintaining continuous 1000/o compliance with <br />the Clean Water Act, and <br />WHEREAS, the pre-1987 debt was incurred by the City of North Olmsted to construct <br />the existing Low Pressure Oxidation No. 1 Building and the existing I,ow Pressure Oxidation <br />No. 2 Building, said debt is being retired by the Special Sewer Levy that is scheduled to be <br />totally retired by 2005, and
The URL can be used to link to this page
Your browser does not support the video tag.