Laserfiche WebLink
10 for ro osed modifications. U on <br />P P p receipt of comments and discussion with City staff, copies of <br />? the final report will be delivered to the City. <br />MANPOWER AND COST ESTIMATES <br />Table 1 provides a breakdown of projected manpower allocations and estimated costs for this <br />project. The total cost of $14,790 included all labor, analytical, and travel expenses. One trip to <br />North Olmsted is included in this cost. <br />SCHEDULE <br />? Bowker & Associates, Inc. is available to begin work on this project immediately upon Notice to <br />Proceed. The proposed project schedule is shown in Figure 1. A start date of January 7, 2002 is <br />? anticipated. A draft report will be delivered to the City within 35 working days of Notice to <br />Proceed, and a final report within 10 days of receipt of comments. <br />QUALIFICATIONS AND EXPERIENCE <br />A summary of qualifications of Bowker & Associates, Inc: is included in Appendix A. Two <br />highly experienced senior odor control engineers will be assigned to this project, ensuring the <br />? <br />highest qualiTy product available. Both have extensive experience in the evaluation and design <br />? of odor control systems. Detailed project descriptions and references are available upon request.