My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-121 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-121 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:56:50 AM
Creation date
1/15/2014 9:21:28 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-121
Legislation Date
1/8/2001
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />? 10/02/2001 18:46 44084624- <br />._ .... ... .. . _. .. . ._. ?„;,,. <br />J.. <br />TRAFFPRO CONSULTAr <br />.?. <br />PAGE 03 <br />Mr. Faul W. Deichtnpnn, P.E. <br />Octobcr 1, 2001 <br />Page 2 <br />SCOPE OlF SERVICES <br />1. Design az? in-pavement roadway warning system for the intersection of Ciague Road <br />and Claguepark Drive. <br />2. The plans will be preparcd in accordance with current City o£ Nozth Olmsted and <br />Ohio Department of Transportation specifications. A complete set of reproducible <br />conscruction documents on 24" x 36" sheets will be prepared, including: <br />a. Plan Layout at a scale of 1"=20'; including all storm, water, gas, telephone <br />and sanitary utilities; <br />b. Plan Details, including: wxzing diagrams, conduit layout and installation <br />details; <br />c. Quantities & SummaxSes; <br />d. Traffic Cantrol Notcs; <br />C. Bid specifAcatians incorporated into a project manual whickz wil} include the <br />advertisement, instructions to bidders, genexal conditions, bad forms, bond <br />requirements, pxevailing wage rates, a#fidavits and other miscellaneaus forms <br />required for a bidding docwaaent; <br />f Estimate of Probable Construction Casts; <br />g. Twelve sets of plans and ten project naanuals shall be furnished to the City foz <br />hidding purposes. Additional sets wi11 be supplied at cost; <br />TIME SCHEDULE <br />5ervices will begin promptly Followi.ng autbozization to proceed. The services are estimated to <br />require eight (8) weeks tp complete, excluding reviews. <br />PERSONNEL AS5IGNED TO PR03ECT <br />Michael W. Schweiekart, P.E. will aet as project rnaraageX/project engineer for the praject. He will <br />coordinate all design activities and serve as the project contact to the Ciry. Because we utilize a <br />"team" approach to design signal systems, our entire engineering staff will provide design input to <br />fuaal design. Mike will be availab)e throughout the design process to azzswer any questions regazding <br />C: \WINDO W S%DesktoplPropusalsW orthOlmstedprQ3.wpd
The URL can be used to link to this page
Your browser does not support the video tag.