My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-096 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-096 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:57:06 AM
Creation date
1/15/2014 10:01:11 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-096
Legislation Date
7/18/2001
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bidder <br />Specifications Compiies <br />Yes N o <br />An ECCO, Model SA917-PM2, solid state electronic audible back-up alarm that actuates <br />when the truck is shifted into reverse shall be provided. The device shall sound at 60 pulses <br />per minute and automatically adjust its volume to maintain a minimum five (5) dba above <br />surrounding environsnental noise levels. <br />MANUAL, CHASSIS PARTS <br />A parts manual for the chassis shall be provided with the completed unit. <br />Part descriptions shall be of the expanded drawing type showing all component parts. <br />The manual shall be specifically for the chassis model being purchased. It s17a11 not be a <br />generic manual for a multitude of different chassis. <br />MANtiALS, CHASSIS SERVICE <br />Two (2) chassis service manuals containing par-ts and service information on major <br />components shall be provided with the completed unit. <br />MANUALS. CHASSIS OPERATION <br />Three (3) illustrated chassis operafion manuals shall be provided. <br />ELECTRICAL WIRING DIAGRAMS <br />Two (2) electrical wiring diagrams, prepared for the model of chassis and body, shall be <br />provided. <br />NA17ATER TA-NIK <br />Booster tanlc shall have a capacity of 750 a <br />allons and be constructed of polypropylene plastic <br />47 <br />bv United Plastic Fabricating, Incorporated. <br />Tank joints az7d seams shall be nitrogeiz welded inside and out. <br />Tanlt shall be baffled in accordance with NFPA Bulletin 1901 requirements. <br />Baffles shall have vent openinas at both the top and bottom to pennit movement of ait- and <br />water between compartments. <br />Longitudinal partitions sha11 be constructed_of .38" polypropylene plastic and shall extend <br />from the bottom of the tank through the top cover to allow for positive weldinQ. <br />Transverse partitions sha11 extend fr•om 4.00" off the bottom of the tanlc to the underside of the <br />top cover. <br />All pai-titions shall interlock and shall be welded to the tank bottom and sides. <br />Tank top shall be constructed of .50" polypropylene. It shall be recessed .38" and shall be <br />welded to the tank sides and the longitudinal partitions. <br />PaQe 34
The URL can be used to link to this page
Your browser does not support the video tag.