Laserfiche WebLink
WADE TRIM/ OHIO, INC. <br />SOUTH CANTERBURY ROAD <br />FEE PROPOSAL <br />Description no. sheets Project Senior Senior Eng CADD 2 man 3 man <br /> Manager PE PE Engineer Tech Tech Tech Crew Crew Admin Total Cost <br /> $105.00 $82.00 $72.00 $60.00 $65.00 $60.00 $54.00 $105.00 $130.00 $40.00 <br />Preliminary <br />Survey Research 16 4 <br /> <br />Field Survey $1,572 <br /> <br />Drainage Survey 4 16 $1,940 <br />Ulilities 4 2 24 $2,650 <br /> 2 $658 <br />Sub-tol3l Hours 4 16 0 0 12 0 2 40 0 0 <br /> 74 $6,820 <br />Oetail Design <br />Titie sheet 1 <br />Typical Sections 1 1 2 2 6 $324 <br />Plan/ Profile q 2 <br />24 <br />24 <br />4 <br />24 12 <br />32 $1,027 <br />intersection Detail 1 2 <br />8 <br />2 <br />?2 $6,806 <br />Cross Sections 3 2 $ $1,540 <br /> <br />Driveway Profile <br />3 <br />1 <br />$ 12 <br />$1,434 <br /> <br />Curb Ramp details <br />1 <br />2 16 $1.449 <br /> <br />Calch Basin details <br />1 <br />6 4 $360 <br /> <br />Sanitary Manhole <br />1 <br />2 $ <br />$792 <br />Sanitary Connections 1 & 2 $144 <br />Storm Sewer Details 1 2 a 8 $1.186 <br />Water line Std/Details 8 4 2 $786 <br />Undergrd Utility 2 2 <br />$ 12 $1,138 <br />Specifcalions <br />12 <br />? 16 $1,650 <br />Cost Estimate 8 12 $2,064 <br />Qa/Qc 4 $480 <br />Meeting 2 $420 <br /> 1 $250 <br />Sub-total Hours 18 0 68 <br /> 76 12 76 86 0 0 13 349 <br />$21,850 <br />Praject Admin <br />Book assembly ? <br />Printing <br />Prebid Meeting 2 2 <br />Review Bids 2 <br />Pre-con 2 2 <br />$ $320 <br />$250 <br />2 $434 <br />$120 <br />2 $434 <br />Review Contr Invoice $ 2 <br />$560 <br />Sub-total Hours 4 0 4 10 0 0 0 0 0 14 32 <br />$2,118 <br />Total 26 16 72 86 24 76 88 40 0 27 455 $30,788