My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-066 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-066 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:57:14 AM
Creation date
1/15/2014 11:02:38 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-066
Legislation Date
6/6/2001
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Clark Merdes, PE <br />Education <br />BSCE Case Western Reserve University, 1991 <br />Registration <br />Professional Engineer, Ohio <br />Additional Education <br />Advanced Confined Space Entry Training Certification <br />ODOT Bridge Inspection Training Certification <br />Experience <br />Clark Merdes, a project engineer with Wade-Trim/Ohio, Inc. has nine years experience in sanitary and <br />storm sewer improvements, storm water control, flood and wetland issues, and road and bridge projects <br />for residential, commercial and industrial sites. He has experience in preparation of plans and <br />specifications for various road projects, yearly bridge inspections, review of building plans for <br />compliance, and assisting communities in obtaining state and federal funding for improvement projects. <br />Some of his project experience is fisted here. <br />• City of Maple Heights - Project engineer responsible for three-phase storm and sanitary sewer <br />replacement project on East 1415t Street, Milo Avenue, and Maple Avenue. Total project <br />included replacement of 4,500 linear feet of 48-inch to 60-inch storm sewer and equal amoutns <br />of 15-inch sanitary sewer at depths from 14 feet to 28 feet within the 4-foot right-of-way. A <br />related project replaced 1,800 linear feet of water line. <br />• NEO Park Sanitary Sewer Project, Garfield Heights - Relocation of sanitary sewer in to allow a <br />business park expansion development to proceed. Plans and specifications were provided. The <br />relocation was 900 linear feet of 10-inch and 10-inch pipe within an acquired easement. <br />• City of Pepper Pike - Project engineer responsible for the design of a detention pond from an <br />existing water feature on the grounds of Ursuline College in Pepper Pike, Ohio. The project will <br />provide seven and a half acre-feet of storage capacity. <br />• City of Lyndhurst - Project engineer responsible for the examination of development <br />requirements for storm water control, sanitary sewage, water supply, flood and wetland issues <br />involved with the planned Montefiore Assisted Living Community in the City of Lyndhurst, Ohio. <br />• Van Epps Storm Sewer and Road Improvements, Brooklyn Heights -Project included the <br />installation of new storm sewers ranging in size from 12-inch to 42-inch and 38-inch x 60-inch <br />elliptical pipe, discharging storm water to three new head walls, with new catch basins, and a <br />paved shoulder of either 8-foot or 3-foot width. <br />• Van Epps Water Line, Brooklyn Heights - Replacement of an aging 10-inch water line adjacent <br />to the improvement project. Completed plan design for the Village of Brooklyn Heights that was <br />approved by the City of Cleveland Division of Water. Installed 1600 linear feet of 12-inch ductile <br />iron water line, and a short length of an 8-inch branch. New fire hydrants and service connection <br />ranging in size from 1-inch taps to 6-inch tees were also installed. <br />R:\RES UMES\MERD ES. D OC
The URL can be used to link to this page
Your browser does not support the video tag.