Laserfiche WebLink
Bonita G. Teeuwen, PE <br />Education <br />BSCE, University of Akron, 1985 <br />Registration <br />Professional Engineer, Ohio <br />Experience <br />Bonnie Teeuwen joined Wade-Trim in December 2000 as a project manager in the TransporEation <br />Services Group. Bonnie has experience in project management and quality assurance obtained during <br />employment with Michael Benza and Associates, Inc. and the Ohio Department of Transporta#ion <br />(ODOT). She has been responsible for design, inspection, and rehabilitation and maintenance plans for <br />numerous highway and road projects in Ohio. Bonnie attended ODOT's Leadership Academy and was <br />administrator for its 55-employee technical support department in District Twelve Construction and <br />Maintenance Department. Her duties have ranged from acquiring projects, facilitating ODOT <br />prequalification in Level 2 bridge design, and securing funding. Bonnie also designed bridge details and <br />authored notes for patching and sealing bridge decks, both of which are used statewide in Ohio. <br />Some of the many projects Bonnie was involved in prior to joining Wade-Trim include the following: <br />• ODOT, D-4, Sum-77-12.62, Killian Road over I-77 - raised superstructure, widened <br />substructure, widened and replace deck. Coordinated with active I-77 add lane project, Summit <br />County's Arlington Road project, and utility relocations <br />• Ohio Turnpike Commission, Add lane from Cuyahoga Valley to SR8 - Finalized final detail <br />submittals of roadway, and managed design for culvert extension and headwall design. <br />• Rocky River, Cuy-6-16.56, Center Ridge Road - Finalized detail plan submittals of roadway <br />plans for Part A, secured funding for Part B, and actively involved with the City and ODOT to <br />resolve construction-related questions. <br />a East Cleveland Annual Bridge Inspection - Performed bridge inspection on 15 railroad bridges <br />over local streets. <br />• East Cleveland, Cuy-6-25.32, Euc(id Avenue - Managed the preparation of plans and <br />specification for base repair, resurFacing including bus pads, replacement of curbs and <br />sidewalks, and upgrading of signals. Coordinated with GCRTA's Euclid Corridor project, City's <br />Community Redevelopment Focus Group, and street lighting project. <br />• East Cleveland Annual Paving Program - Managed the preparation of the citywide annual <br />resurFacing program including complete rehabilitation where needed. <br />? County of Summit Engineer, Triplett Blvd. Over Springfield Stream - Managed the preparation of <br />plans and specifications of a single-span bridge, including hydraulic analysis. <br />Professional Association <br />Association of Bridge Construction and Design <br />American Society of Highway Engineers, Secretary, Lake Erie Section <br />R:\RESUMES\TEEUWEN.DOC