Laserfiche WebLink
WADE TRIM! OHIO <br />INC <br /> <br />REPLAC <br />EMEN , <br />. <br />T OF THE STORM SEWER ON COL <br />UMBI <br /> A ROAD <br /> CITY OF NORTN OLMSTED <br /> FEE PROPOSAL <br />Description No. <br />Sheets Su Project <br />bconsult Manager Senior <br />PE <br />Eng <br />PE <br />r <br />? <br />? <br /> <br />Preliminary <br />$105.00 <br />$82.00 Engineer Tech <br />Te <br />h Tec <br />h <br />$72.00 $65.00 $68.00 $54.00 $45 <br />00 C ew <br />$105 <br />00 C ew Admin Totai <br /> <br />Video Review of San . . $130.00 $40.00 <br />Survey Research 2 <br />Fieid Survey 4 4 $108 <br />Drainage Survey 2 8 $600 <br />Utilities ' 1 8 $976 <br /> 1 2 q 28 $908 <br />Sub-totai Hours $3,361 <br /> <br /> <br />Detail Design 1 4 0 0 9 2 4 44 <br />? <br />? <br />64 <br />$5,953 <br />Title Sheet 1 <br /> <br />Pian/ Profle <br />g 1 <br />1 4 <br />CrossoverProfles <br />Z 3 48 16 11p $353 <br /> <br />Catch Basin Details <br />1 1 4 2 20 $10,799 <br /> <br />"`? Sidewalk/ Apron Detaiis <br />1 <br />4 2 8 $1,609 <br />Stub Details 1 2 4 $784 <br /> <br /> <br />Trench Detaii 4 2 12 <br />$316 <br />Specifications 2 $1,044 <br />Cost Estimate 24 $90 <br />Qa/Qc 4 4 $1,888 <br />Meetings 2 $368 <br /> Z $420 <br />Sub-total Hours ? $250 <br /> 11 0 84 4 25 142 18 0 0 <br />1 <br /> <br />Project Admin 291 $17,921 <br />Book assembly <br />Printing <br /> <br />Prebid Meeting 8 $320 <br /> <br />Review Bids 2 <br />2 $250 <br /> <br />Pre-con <br />2 2 <br />$434 <br /> 2 2 $130 <br /> <br />Review Contr Invoice 2 $434 <br /> 8 <br /> <br />Sub-total Hours 2 $600 <br /> 4 0 4 10 0 <br />0 0 <br />0 <br />0 <br />14 <br />32 <br />$2,168 <br />Total <br /> 16 4 88 14 34 144 22 44 0 21 387 <br />$26,042