Laserfiche WebLink
PROPOSA.L St1MTvlARy <br />Serafin Golf Course Design, Inc. along with Irrigation Designs, Inc. and Motter 8z Mea.dows <br />Architects is pleased to submit this proposal ta the City of North Olmsted for the Springvale Golf <br />Course Renovations. <br />It is our understanding that this project will proceed on the following schedule: <br />Prelimuiary Design: April - May 2001 <br />Final Design/Construction Documents: June 2001 <br />Bidding July 2001 <br />Start Construction July - Augua.st 2001 <br />The above mentioned design team will initiate the project by meeting with the City of North <br />Olmsted representatives to determine the parameters and overall objectives of the-project and the <br />design concepts to be applied. A review of the golf course, existing irrigation system and <br />maintenance building area will then be com.pleted. Based upon the inforrnation gathered, the design <br />team wi11 then prepare a Preliinitiary Master Plan. A preliminary gol£ course renovation plan, <br />irrigacion renovations, preluiunaiy maintenance building and pump house designs, preliminary wojk <br />sequence and schedu.le, and a preliminary cost estimate will be included with the Preliminary Master <br />Plan. The objective of the overall renovations, as it is with all our designs, is to incorporate the golf <br />course onto the exiscing features of the site. By blending the golf cou.rse with the existing <br />characteristics of the land we will be able to keep construction costs down and design a rnore <br />natural, and visually pleasing golf course. <br />Upon approval of the Preliminary Design by the City of North Olmsted representatives, the design <br />team will prepare Construction I7ocuments. Detailed plans of all golf course renovations, an <br />irrigation final plan, maintenance building and pump house final plans; and specifications for <br />bidding will be included with the Construction Documents. An irnerim set of Construction <br />Documents and Specifications will be subnnitted to the City of North Olmsted for review before <br />bidding. Upon acceptance of a successful bidder the design team will then oversee a71 renovations to <br />insure the progress and qualitq of work being done. <br />The total design fee for Springvale Golf Course Renovations, irrigation renovations, ma?ntenance <br />building and pump house designs, and construction observation for the entire project is $88,640.00 <br />including estimated expenses as outlined in the proposal. <br />This design team is dedicated, knowledgeable, and experienced. This design team presently has a <br />workload that will allow them to take on this project and give it their fullest attention. Thank you <br />for the opportuniry to subm,it this proposal. We hope we will have the pleasure of working with you <br />on this project.