My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-051 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-051 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:57:21 AM
Creation date
1/15/2014 11:09:41 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-051
Legislation Date
4/24/2001
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IREUGA'T?ON DESIGNS IINC INC. <br />Mark A. Pena, President <br />E-Mail: aquadesigils@admiral.cc <br />June 16, 2000 <br />Mr. Marty Young <br />General 1Vlanager <br />Springva.le Country Club <br />5817 Canterbury Road <br />North Olmsted, Ohio 44070 <br />Dear Mr.Young: <br />34363 Summer Hi11 Drive <br />Avon, Ohio 44011 <br />Phone: 440-937-5708 <br />Fax: 440-937-9248 <br />Irrigation Designs, Inc would like to thank you for the opportunity to submit a proposal <br />for Springvale Country Club's new propos.ed irrigation system. The proposal wiil be <br />divided into phases outlining the services proposed to the Springvale Country Club, <br />located in TVorth Oimsted, Ohio. <br />PHASE I - ]PRELIMINARY DESIGN <br />During this preliminary design phase, Inigation Designs, Inc will produce a sprinlcler <br />layout and schedule a visit to Springvale Country Club. At this time we will review the <br />sprinlcler plan and gather additional information regarding mainline pipe routing, water <br />and power supply, iypes of control systems and irrigation scheduling. Irrigation Designs, <br />Inc will complete thess changes and visit Springvale Country Club with a second design <br />for review. This plan will show a revised sprinkler layout, mainline pipe routing, power <br />supply locations and initial punlp system requirements. Cost estimates for the entire <br />project will be provided to you during this meeting for review. This phase includes: <br />1. Sprinkier layout and coverage. <br />2. Mainline pipe routing. <br />3. Power supply locations. <br />4. Water supply, water usage and refill volume required. <br />5. Product selection; Manufacturers and types of control svstems. <br />6: Purnp system requirements. <br />7. Cost estimates. <br />8. Two review meetings.
The URL can be used to link to this page
Your browser does not support the video tag.