Laserfiche WebLink
<br />DOCUMENT <br />SUBMISSION 7he Consulting Team shatl provide the Owner with the foliowing <br />documents during the course of this project: <br />1. Preliminary Drawings, Cotored Rendering of Entry / Ramp. <br />2. Four sets of the Preliminary Drawings. <br />3. Final Development Plans, Four sets of documents for review as <br />well as other stated Gavemment entities. <br />4. Verification letter that project work is compliant to ADA <br />Standards. <br />5. Six (6) sets to North Olmsted Buitding Dept. for permitting, Fire <br />review. <br />6. One (1) Fina! Cost Estimate of Final Master Plan to Owner. <br />PROJECT <br />SCHEDULE The Consulting Team is prepared to meet the Owner's schedule if <br />one will be required. <br />All work shall be completed within three (3) months from the time the <br />Owner notifies RWl Team to proceed, after preliminary approvals. <br />Includss Construction Document Drawings and Specifications. <br />COST OF <br />SERVICES The maximum cost of senrices for the work outlined above shall not <br />exceed $12.500.00 . Reimbursement for the cost of pho#agraphy <br />and printing shall be in addition to the cost of services. Fees for <br />Architectural Phases are shown below. <br />ARCHITECTURAL <br />FEES: P.tlASES 14 COSTS <br />A. Architectural Program Phase 2 $250. <br />B Preliminarv Desian Phase 35 .375. <br />C. Construction Document Phase 45 $5,625. <br />0. Bidding, Negotiation Phase 5 $625. <br />E. Construction Administration Phase 10 $1,250. <br />F. Project Ctose-out 3 $375. <br />*' TOTAL FEE $12,500. <br />M*Reimbursement for the cost of Survey, Building Permit, and <br />Reproduction costs shall be in addition to Architectural Fees listed <br />above. City of North Olmsted shall provide verified setback <br />requirements, right-of-way information; curb cut access to <br />Canterbury (if allowed). <br />Hourly rates for additional work listed below: <br />Principals Landig, Hausmann, Frederick ...................$65.OO/hr. <br />Belloma, Weber & Consultants ...............................$50.00/hr. <br />4 <br />