My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-012 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1998
>
98-012 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 12:01:56 PM
Creation date
1/16/2014 6:02:27 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
98-012
Legislation Date
3/18/1998
Year
1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />;s Page n <br />ro?n? <br />All drawings will be prepared using AutoCAD Version 12, and additions to the Project Mamual <br />will be prepared using Wordpertecc for Windows. The AutoCAD drawings anci the additions to <br />che Project Manual will be made available co the City on hard copy ard on diskettes upon <br />completion of tte project. <br />The following design aspects will be addressed in the plans and specifications: <br />a• Roadway, Desion: The roadway plans will show all the infomiarion regatding aligmuem, <br />profile, typical secaons and geometries. The following scales will be used, if approved <br />by the ciry: <br />Plan 1 20' <br />Profile 120' horizontal, 1" = 5' vertical <br />Typical Sections 1 /4" = 1' -0" <br />The scafe for the detaits will be selecced to best represent the required information. <br />Alf utilities including storm sewers. sanitary sewers and water lines will be shown in <br />both pian and profile views. <br />It is not anticipated that cross sections or driveway profiles will be required. <br />b. Drai= Lk?=: T'he design documents will include the repair, rebuilding or replacettent <br />of cauh basins and manhotes as necessary. <br />c. Traffic Concrol: A pavement marking plan will be prepared to re-establish the existing <br />traffic patoerns after resucfacing. <br />d. Utilitv Coordinazion: All utility owners will be contacted when the project is initiazed, <br />arxi they will receive copies of che plans from the preliminary submission and from ttie <br />final tracings. <br />e. Geotechnical-Invesrigations: No geotechnical imestigations will be performed as part <br />of this projext. <br />eviews: All reviews will be performed by the City of North Olmsted. No reviews <br />will be performed by the Ohio Department of Transportauon or the Cuyahoga Courny <br />Engineer. <br />g. Conscruccion Cost ExamarE: A detailed consnvction cost estimate will be submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.