My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-012 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1998
>
98-012 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 12:01:56 PM
Creation date
1/16/2014 6:02:27 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
98-012
Legislation Date
3/18/1998
Year
1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ? ' <br /> <br />Constant coruact was kept with the uality owners in the area to address the required relocations <br />of underground telephone 1ires, gas lunes, waeer 1'unes atyd uriiity poles. A ttlocation dilenmna was <br />created involving a 12" water line when rhe new profile of Richmond Rnad was clesigneci. The <br />exissting 12" water line, which sac in the middle of tlx road, did not have enough of r,te milirnm <br />allovved cover in the new Richmond Road design. T'tC solution was to totaUy retvcate tlx line and <br />its service connections w residences, institudons, and hydrants. <br />Right-oi-Way plans were developed for eleven ptopeny ownecs. Overall, eleven warrazity deEds, <br />eleven temporary easmnents, and seven sewer easements were developeti. All areas and beuings <br />, for easements and properry parcels were calculat,ed?using AdCadd Civil Release 12 softwace. <br />Polytech, Inc. as prime corsulcant also supervised and managed the tield survey and geotechnicai <br />consuitants. <br />The finat drawings included: <br />• Roadway Plans <br />• Maintenance of Traffic P(ans <br />• Traffic Control Plans <br />• Stocm Water Pollution Plans <br />• Water Work Plans <br />• 5attitary Sewer Plans <br />• Drainage Plans <br />• Right-of-Way Plans <br />Specifications and final construction cost estimates were prepared and submitted with the final <br />drawings.
The URL can be used to link to this page
Your browser does not support the video tag.