Laserfiche WebLink
? <br />,?. <br />Page 2 <br />Mayor Ed Boyle <br />City of North Olmsted <br />'"WN <br />%up-0, <br />April 24, 1990 <br />Revised - April 27, 1990 <br />Lane and Country Club Boulevard from Lorain Road to Victoria Lane <br />will generally consist of total pavement replacement, horizontal <br />alignment revisions and replacement of the storm and sanitary sewer <br />systems. Proposed construction for Country Club Boulevard from <br />Victoria Lane to Columbia Road will generally consist of the <br />replacement of deteriorated concrete pavement and curbs and the <br />installation of trench drains. <br />Construction documents and engineering design parameters <br />will be in accordance with the latest ODOT and North Olmsted City <br />Standards. <br />Construction documents will include a title sheet, general <br />notes, typical sections, plan sheets, cross sections and <br />miscellaneous detail sheets. <br />Construction plan design will incorporate all normal <br />engineering considerations for a project of this type. <br />The horizontal alignment revisions consist of the relocation <br />of the Country Club Boulevard/Lorain Road intersections as <br />discussed in our recent meetings. The proposed alignment will <br />necessitate the demolition of an existing structure. The <br />demoliti?e not thsof thercontractldocumentsdprall oposed fortthis <br />costs, a Part <br />proj ect . <br />It is understood that any traffic warrants required for this <br />project will be provided by the City. Pavement striping, <br />maintenance of traffic and curb ramps will be included in the <br />plans. <br />Construction documents will include and be based on the <br />latest ODOT Construction and Material Specifications. <br />B. Surveying Services <br />The W.R.E.S. Corporation will perform all field surveys <br />necessary to develop the final construction plans and <br />specifications.