Laserfiche WebLink
• ? ? <br />Page 4 <br />Mayor Ed Boyle <br />City of North Olmsted <br />April 24, 1990 <br />Revised - April 27, 1990 <br />for the preparation of such plans and specifications based on the <br />preliminary construction cost established in this proposal. <br />TV SUPPLEMENTARY SERVICES AND CHARGES <br />Not included in the percentage fee for basic services are <br />various supplementary services. These supplementary services vary <br />greatly in scope, complexity and timing. They may be a prominent <br />part of some engineering projects and not exist with others. Such <br />supplementary services when performed by the Engineer shall be paid <br />at our prevailing per diem rates. When performed by others the <br />charge will be a direct reimbursement. <br />1. Calculation of special assessments. <br />2. Procuring permits, easements or rights-of-way. <br />3. Additional services resulting from significant changes <br />in the greater scope of design of the project. <br />4. Preparing for public hearing or attendance. <br />5. Specialized traffic studies. <br />6. Environmental impact statements. <br />7. Cost of test borings or other sub-surface <br />explorations. <br />8. Field surveys for construction staking. <br />9. Resident Engineer. <br />10. Construction Observer. <br />11. Shop, mill, field or laboratory inspection of <br />materials. <br />12. Preparation of "as built" drawings.