My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-032 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1996
>
96-032 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 10:10:52 AM
Creation date
1/17/2014 11:01:55 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
96-032
Legislation Date
2/21/1996
Year
1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. .., .?4.. , ?..._ <br />? <br />Page 3 <br />City of North Olmsted <br />Attn: Mr. Ralph Bohlmann, <br />Service Director <br />U. PRUJECT PERSONNEL <br />January 19, 1996 <br />The following Western Reserve personnel will be used for this project. <br />Project Manager - Robert J. Knopf, Jr. <br />Project Engineer - Ronald B. Shaw, P.E. <br />III. TIlVIE SCHEDULE <br />The study will be completed within twelve (12) weeks of authorization to proceed. <br />IV. FEE SCHEDLTLE <br />We propose a fee for the above basic services of Ten Thousand Two Hundred Dollars <br />($10,200.00). <br />IV. SUPPLEMENTARY SERVICES AND CHARGES <br />Not included in the fee for basic services are various supplementary services. These <br />supplementary services vary greatly in scope, complexity and timing. They may be a prominent <br />part of some engineering projects and not exist with others. Such supplementary services when <br />performed by the Engineer shall be paid at our prevailing per diem rates. When performed by <br />others, the charge will be at 1.1 times the actual cost to cover overhead. Supplementary <br />Services will not be performed unless agreed to by the City in writing. <br />1. Calculation of special assessments. <br />2. Procuring permits, easements or rights-of-way. <br />3. Additional services resulting from significant changes in the general scope of <br />design of the project. <br />4. Preparing for public hearing or attendance. <br />5. Specialized traffic studies.
The URL can be used to link to this page
Your browser does not support the video tag.