My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2015-091
Document-Host
>
City North Olmsted
>
Legislation
>
2015
>
Resolution 2015-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 5:39:35 PM
Creation date
10/8/2015 5:39:34 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2015-91
Legislation Date
10/6/2015
Year
2015
Legislation Title
WWTP Bldg. 12 Roof Contract Bids
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. Proper installation of flashing and roofing materials around existing crane and lighting <br /> poles (located on the top of the blower building). <br /> g. Replacement of the material along the interior of the parapet wall. <br /> h. Replacement and properly secure the parapet wall cap. <br /> i. Ensuring that the entire roofing system is water tight and provides adequate slope and <br /> drainage to the existing roof drains. <br /> j. Properly flash all roof penetrations. <br /> k. Recondition existing roof drains. <br /> I. Timely coordination with plant staff to scheduling and start date(s). <br /> 5. Specifications for the 2015 Blower Building BUILT-UP BITUMINOUS ROOFING are in <br /> the attachments. These specifications are designed to match the existing roof projects <br /> completed at the wastewater treatment plant during the years 2012, 2013, and 2014 as <br /> part of Phase 2 construction at the treatment plant. Please be aware that manufacture <br /> inspection visits are waived on roofing projects under$50,000. <br /> North Olmsted WWTP <br /> Blower Building Roof 2015 <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.