Laserfiche WebLink
f. Proper installation of flashing and roofing materials around existing crane and lighting <br /> poles (located on the top of the blower building). <br /> g. Replacement of the material along the interior of the parapet wall. <br /> h. Replacement and properly secure the parapet wall cap. <br /> i. Ensuring that the entire roofing system is water tight and provides adequate slope and <br /> drainage to the existing roof drains. <br /> j. Properly flash all roof penetrations. <br /> k. Recondition existing roof drains. <br /> I. Timely coordination with plant staff to scheduling and start date(s). <br /> 5. Specifications for the 2015 Blower Building BUILT-UP BITUMINOUS ROOFING are in <br /> the attachments. These specifications are designed to match the existing roof projects <br /> completed at the wastewater treatment plant during the years 2012, 2013, and 2014 as <br /> part of Phase 2 construction at the treatment plant. Please be aware that manufacture <br /> inspection visits are waived on roofing projects under$50,000. <br /> North Olmsted WWTP <br /> Blower Building Roof 2015 <br /> Page 4 of 5 <br />