My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-042 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-042 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:46:33 AM
Creation date
5/9/2016 3:37:56 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-042
Legislation Date
5/3/2016
Year
2016
Legislation Title
Bids Demolish and New Building at Site of Former Tank #1 Building at WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
outlined in Chapter 20 of ACI 318, Building Code Requirements for Reinforced <br />Concrete. <br />F. Contractor shall give Owner 48 hours' notice before any pour requiring testing. <br />PART 5.00 — SUBMITTALS <br />5.01 WORK INCLUDED: Two (2) copies of the following (unless noted otherwise) shall be <br />submitted to the Engineer and one (1) copy to the Owner's Representative for review and <br />approval: <br />A. Design of concrete mixes in accordance with this specification and ACI 301, <br />Chapter 3. <br />B. Reinforcing steel shop drawings, bar lists and bending and erection drawings. <br />Two (2) sets of these documents shall accompany the first load of reinforcing <br />delivered to the job site. <br />C. Test Reports and material certifications as noted elsewhere in this specification, <br />and/or on the drawings. <br />D. One (1) reproducible of the final reinforcing steel shop drawings shall be <br />forwarded to the Engineer when they are issued to the shop. <br />
The URL can be used to link to this page
Your browser does not support the video tag.