My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-042 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-042 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:46:33 AM
Creation date
5/9/2016 3:37:56 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-042
Legislation Date
5/3/2016
Year
2016
Legislation Title
Bids Demolish and New Building at Site of Former Tank #1 Building at WWTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. REPLACEMENTS: <br />1. In the event of damage to materials or work in place, all necessary repairs <br />and replacements shall be immediately made to the satisfaction of the <br />Engineer at no additional cost to the Owner. <br />2. Damaged material shall be repaired or replaced at the option of the <br />Engineer. <br />3. Any rejected material shall be immediately removed from the jobsite and <br />replaced by new material at no additional cost to the Owner. <br />1.06 ACCEPTANCE AND TOLERANCES: <br />A. Work failing to comply with any part of these specifications will be subject to <br />rejection by the Engineer. <br />B. Bent or disfigured components will not be accepted. <br />1.07 CERTIFICATION: The pre-engineered metal building manufacturer shall issue a letter of <br />certification typed on his letterhead certifying that the design, fabrication and <br />erection of the pre-engineered metal building complies with the approved shop drawings <br />and these specifications. This letter shall be signed and sealed by a Registered <br />Professional Engineer licensed in the state of Ohio. <br />1.08 WARRANTY: <br />A. Pre-engineered metal buildings shall be warranted in writing against defects in <br />materials and workmanship for a period of one year from date of final acceptance <br />of project. <br />B. Wall panel finish shall be warranted in writing against the following from date of <br />shipment as listed below: <br />1. Chalking in excess of ASTM D659, No. 8 rating - 5 years. <br />2. Fading more than 5 NBS units - 10 years. <br />3. Cracking, checking, blistering, peeling, flaking, chipping or lose of <br />adhesive - 10 years. <br />C. Roof panels shall be warranted in writing against perforation due to corrosion for <br />a period of twenty-five (25) years from date of shipment. The total potential <br />liability of this warranty shall be equal to the original installed value of the roof <br />panels. <br />D. Pre-engineered metal building roof shall be warranted in writing for <br />weathertightness for a period of ten years from date of shipment. The total <br />potential liability of this warranty shall be 25 percent of the original installed <br />value of work under this Section. <br />2012.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.