My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-092 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-092 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:42:41 AM
Creation date
10/3/2016 1:37:10 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-092
Legislation Date
9/20/2016
Year
2016
Legislation Title
Butternut Ridge Road Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.3 Availability of Local Funds <br />Attach a statement signed by the Chief Financial Officer listed in section 5.2 certifying all local <br />resources required for the project will be available on or before the earliest date listed in the Project <br />Schedule section. The OPWC Agreement will not be released until the local resources are certified. <br />Failure to meet local share may result in termination of the project. Applicant needs to provide written <br />confirmation for funds coming from other funding sources. <br />2.0 Repair / Replacement or New / Expansion <br />2.1 Total Portion of Project Repair / Replacement: 1,550,000 .00 100 % A Farmland <br />Preservation letter is <br />required for any <br />2.2 Total Portion of Project New / Expansion: 0 .00 0 % impact tofarrind <br />2.3 Total Project: 1.550.000 .00 100 % <br />3.0 Project Schedule <br />3.1 Engineering / Design / Right of Way Begin Date: 03/01/2017 End Date: 10/31/2017 <br />3.2 Bid Advertisement and Award Begin Date: 11/01/2017 End Date: 02/28/2018 <br />3.3 Construction Begin Date: 04/01/2018 End Date: 08/31/2018 <br />Construction cannot begin prior to release of executed Project Agreement and issuance of Notice to Proceed. <br />Failure to meet project schedule may result in termination of agreement for approved projects. <br />Modification of dates must be requested in writing by project official of record and approved by the <br />Commission once the Project Agreement has been executed, <br />4.0 Project Information <br />If the project is multi -jurisdictional, information must be consolidated in this section. <br />4.1 Useful Life / Cost Estimate / Age of Infrastructure <br />Project Useful Life: 20 Years Age: 1992 (Year built or year of last major improvement) <br />Attach Registered Professional Engineer's statement, with seal or stamp and signature confirming the <br />project's useful life indicated above and detailed cost estimate. <br />4.2 User Information <br />Road or Bridge: Current ADT 12,450 Year 2012 Projected ADT 12,450 Year 2032 <br />Water / Wastewater: Based on monthly usage of 4,500 gallons per household; attach current ordinances. <br />Residential Water Rate <br />Number of households served: 0 <br />Residential Wastewater Rate <br />Number of households served: 0 <br />Stormwater: Number of households served: <br />Current $ Proposed $ <br />Current $ Proposed $ <br />n <br />Form OPWC0001 Rev. 8.11 Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.