Laserfiche WebLink
EXHIBIT A <br />(Tcsultants <br />SCOPE OF ENGINEERING SERVICES <br />CITY OF NORTH OLMSTED, OHIO <br />SOUTH INTERCEPTOR INFILTRATION/INFLOW STUDY <br />Task 4 — Alternative Development <br />• Develop and model alternatives to alleviate interceptor issues including: <br />o Location and size of equalization basins at 3 locations <br />o Compute the interceptor capacity and level of service for each segment of <br />the interceptor <br />o Develop recommended improvements for segments of the interceptor that <br />have physical restrictions such as changes of direction and diameter <br />• Develop preliminary opinion of probable construction cost for feasible alternatives <br />• Review alternatives with City <br />• Finalize preferred alternatives and develop recommended improvements <br />Task 5 — Report <br />• Develop report summarizing project <br />o Model development background <br />o Flow meter data analysis results <br />o Hydraulic model analysis <br />o Interceptor issues <br />o Alternative review <br />o Alternative recommendation <br />M:\PROPOSAL\20171North OlmstedlSouth Side Interceptor Study_P170640\AgreementkScope Of Services - 11-9-17 CPR. Docx <br />Prepared by CT Consultants, Inc. I November 9, 2017 <br />