My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-083 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2017
>
2017-083 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 12:15:43 PM
Creation date
12/20/2017 12:00:22 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2017-083
Legislation Date
12/19/2017
Year
2017
Legislation Title
Amend Chapter 911, Chapter 915 and Chapter 917
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IN DEPOSIT. <br />The provisions of this section shall apply to all applicants for a tap -in permit to <br />discharge to the municipal sanitary sewerage system and which are in that portion of <br />the system for which sewer user charges are based on water consumption as per Section <br />915.07. These provisions do not apply to tap -in permits for an addition or change in <br />use to a building already served by the municipal sanitary sewerage system. <br />(a) In addition to the tap -in charge required in accordance with the provisions <br />of Section 911.09(b), the applicant shall deposit with the City seven hundred fifty <br />dollars ($750.00) per dwelling unit or three thousand dollars ($3,000) per <br />commercial structure for each tap -in permit for which the applicant has applied. <br />This tap -in deposit shall cover the cost of any sewer user charges, as per Section <br />915.04, that are due the City after the installation of the sanitary sewer connection <br />which were not billed by the Cleveland Water Department, hereinafter referred to <br />as delinquent sewer user charges. <br />(b) Delinquent sewer charges shall be calculated at the current rate per 1,000 <br />cubic feet (1 MCF) in Section 915.04 times 2 MCF per dwelling unit, or for a <br />multi -family dwelling or commercial structure 2 MCF per benefitted unit as listed <br />in Section 911.09, per calendar month or fraction thereof that such charges are <br />delinquent. Delinquency shall be measured from the date of installation of the <br />sewer connection in the case of an existing structure, or from the date of the <br />issuance of an occupancy permit for a new structure, to the date of initial sewer <br />service as shown on the bill from the Cleveland Water Department. <br />(c) The applicant must comply with the following requirements: <br />(1) The applicant must call the North Olmsted Engineering Department <br />for inspection, if in the City of North Olmsted or verification if in Olmsted <br />Township, of the sewer tap -in and connection upon completion of the installation <br />of the piping. <br />(2) If a new dwelling or building in Olmsted Township, the applicant must <br />provide the North Olmsted Engineering Department with a copy of the occupancy <br />permit issued by Olmsted Township. <br />(3) The applicant must furnish the North Olmsted Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.