My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
82-172 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1982
>
82-172 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 11:58:01 AM
Creation date
12/13/2013 2:50:15 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
82-172
Legislation Date
1/19/1983
Year
1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16S Permit and Inspection Fees 1321.03 <br />(34) Grease trap $ 10.00 <br />(35) Sanitary sewer connection 30.00 <br />(36) Permit to install storm sewer: <br /> Initial fee 7.00 <br /> Per 100 linear feet: ' <br /> 4 inch to 6 inch 3.00 <br /> 8 inch 4.00 <br /> 10 inch 5.00 <br /> 12 inch 6.00 <br /> 16 inch 8.00 <br /> 18 inch 10.00 <br /> 24 inches and over 12.00 <br />(c) Gas Piping (residential only). The minimum fee for any <br />permit to install gas piping shall be 4.00 <br />to which shall be added for each outlet 1.50 <br />(Ord. 80-81. Passed 7-15-80. ) <br />1321.03 HEATING, VENTILATING, AIR, CONDITIONING AND REFRIGERATION <br />LICENSE FEES. <br />The following fee schedule shall prevail for all heating, ventilating, air conditioning <br />and refrigeration work to be performed. <br />(a) License. (See Chapter 1317 for general provisions on registration and <br />licensing of contractors. ) <br />Registration fee - each calendar year $ 40. UO <br />(b) All new heating systems, alterations, repairs or <br />additions to heating systems, in addition to applicable <br />plumbing and/or electrical permits. <br />For the installation of each new warm air furnace <br />and es.cti water or steam boiler: <br />Unit Fee <br />(1) Up to and including 150,000 BTU capacity $ 20.00 <br />(2) Over 150, 000 BTU input capacity 20.00 <br />For each additional 10, 000 BTU or fraction ' <br />thereof 10.00 <br />(3) For alterations, repairs, additions and <br />replacement up to and including 150, 000 <br />BTU input capacity 10.00 <br />Over 150,000 BTU input capacity 10.00 <br />For each additional 10, OUO BTU or <br />fraction thereof 1.00 <br />1982 Replacement
The URL can be used to link to this page
Your browser does not support the video tag.