Laserfiche WebLink
<br />1321. 03 BUILDING C ODE 16T <br /> ? <br />(c) Installation of a gas conversion burner or oil burner: <br />(1) When part of an installation is made under a permit <br /> issued pursuant to subsection (b) (1), (2) or <br /> (3) hereof None , <br />(2) Separate installation $ 10.00 <br />(d) For the installation of each overhead unit heater and <br />eac h space heater (gas, electric heaters, or otherwise) <br />including duct heaters. <br />(1) Up to and including 75,000 BTU input <br /> capacity 15.00 <br />(2) Over 75, 000 BTU input capacity 10.00 <br /> A. For each additional 10,000 BTU <br /> or fraction thereof 10.00 <br /> B. Each additional unit 5.00 <br />(3) For installation of electric whole house <br /> baseboard heating 20.00 per house <br />(4) Other replacements than listed under this schedule: <br /> A. R.eplacement of first unit 10.00 <br /> B. Replacement of second or more units, <br /> each 5.00 <br /> <br />(5) <br />Thru-wall sealed combustion heaters, not exceeding ? <br /> 100, 000 BTU input, each unit 8.00 <br /> A. Each additional unit 4.00 <br /> B. Replacement of sealed combustion <br /> appliance 4.00 <br />(6) Installation of domestic-type portable <br /> incinerator not exceeding 2 1/2 cubic feet <br /> combustion chamber volume 5.50 <br />(7) Free-standing fireplace and/or heating unit 10.00 <br />(8) Energy vent type unit 5.00 <br />(9) Solar heating 25.00 <br />(10) Heat pump: <br /> Residential 20.00 <br /> Commercial 30.00 <br />(e) For the installation of gas infrared units: <br />(1) Up to and including 50, 000 BTU input <br />capacity 5.00 <br />(2) Over 50, 000 BTU input capacity 8.00 <br />(f) Ventilation - Commercial. <br />(1) Installation of each new exhaust system <br />for kitchen and cooking space, including duct, hood and ? <br />grease filters: <br />1982 Replacement