My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-029 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2019
>
2019-029 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 11:46:32 AM
Creation date
2/22/2019 11:44:07 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2019-029
Legislation Date
2/19/2019
Year
2019
Legislation Title
John Patrick Picard Architect Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT <br />n,*,1a <br />JOHN PATRICK <br />PICARD <br />ARCHITECT INC. <br />First North Building <br />50 North Avenue NE, Suite 102 <br />Massillon, Ohio 44646 <br />PHONE: (330) 471-9000 <br />January 30, 2019 <br />Mr. Dave Demaline <br />Streets and Facilities Foreman <br />City of North Olmsted <br />Department of Public Service <br />5200 Dover Center Road <br />North Olmsted, Ohio 44070 <br />Reference: Architectural Services Proposal <br />Dear Mr. Demaline, <br />Thank you for the opportunity to offer my architectural and engineering services in the 2,000 <br />square foot brick veneer addition, as well as the re -roofing of the existing 15,400 square foot <br />building (North Olmsted Police Department). <br />Architectural Services Include: <br />• Field measuring to verify existing conditions <br />• Evaluation of existing conditions <br />• Building code review <br />• Design development and associated meetings <br />• Development of construction documents for competitive bidding and associated meetings <br />• Coordination with code officials (Building, Planning, Zoning, and Fire) and consulting <br />engineers <br />• Develop graphic and written scope of work documents for contractor continued <br />preliminary costing <br />• Construction and contract administration services <br />Some of the documents required and included in this proposal are as follows: <br />• General notes and specifications <br />• Accessibility guidelines and details <br />• Design development drawings <br />• Floor plans and details <br />• Exterior elevations and details <br />• Building wall sections and details <br />• Foundation plan and details <br />
The URL can be used to link to this page
Your browser does not support the video tag.