My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-029 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2019
>
2019-029 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 11:46:32 AM
Creation date
2/22/2019 11:44:07 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2019-029
Legislation Date
2/19/2019
Year
2019
Legislation Title
John Patrick Picard Architect Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 30, 2019 <br />Page 2 of 3 <br />• Roofing plans and details <br />• Structural framing plan and details <br />• Interior elevations and details <br />• Reflective ceiling plans and details <br />• Demolition plans and details <br />• Finishes schedule and related details <br />• Window schedule and details <br />• Door schedules and related details <br />• Code data and specifications <br />• HVAC design and details <br />• Plumbing design and details <br />• Electrical design and details <br />• Phone and data "rough in" support system design and details <br />• Fire alarm and life safety design and details <br />• Plans examination and permits applications <br />• Construction administration and bidding documents <br />Architectural Design and Construction Document Services..... <br />$ 29,200.00 <br />Structural Engineering Services ................................................. <br />$ 6,000.00 <br />Topographic and Boundary Survey ........................................... <br />$ NA <br />CivilEngineering Services.......................................................... <br />$ NA <br />Plumbing/HVAC Engineering Services ..................................... <br />$ 4,000.00 <br />Fire Protection Engineering Services ......................................... <br />$ NA <br />Interior Finish Selection / Furniture Procurement Services..... <br />$ NA <br />Electrical Engineering Services .................................................. <br />S 6,500.00 <br />Additional Engineering for Exhaust Fan ................................... <br />$ 500.00 <br />Asbestos Sampling and Testing .................................................. <br />$ 1,425.00 <br />Reimbursable Cost Estimate...................................................... <br />$ 2,000.00 <br />Bidding and Construction Administration Services .................. <br />$ 25,000.00 <br />TOTAL COST OF SERVICE..................................................................... S74,625.00 <br />All services listed above and any services required beyond services listed are billed (monthly) at <br />the firm's hourly rates as follows: A finance charge of 1-1/2% per month (18% per year) will be <br />added to the unpaid balance after 30 days. <br />Architect .................................... $ 135.00/hr <br />Design Staff ................................ $ 65.00/hr <br />Technical Staff ........................... $ 45.00/hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.