Laserfiche WebLink
Exhibit'A' <br />A. Contract Documents Phase — ENGINEER will: <br />• Prepare detailed constriction drawings for public bidding, permits and construction. <br />• Prepare specifications to support construction drawings, materials and systems. <br />• Update the Opinion of Probable Construction Cost. <br />• Prepare bidding information. <br />• Assist the Owner in connection with the Owner's responsibility for filing documents <br />required for the approval of governmental authorities having jurisdiction over the <br />Project. <br />B. Bidding and Negotiation Phase — ENGINEER will: <br />• Following the Owner's approval of the construction documents and the final estimate <br />of eonStrLlNiOtl cost, the ENGINEER will assist the Owner in obtaining bids and <br /><rssi:t in awarding and preparing contracts for construction. <br />C. Construction Phase —ENGINEER will: <br />• Adv i:_,c and consult with the Owner during the construction phase, as well as visit the <br />site ,;t intervals appropriate to the stage of the contractor's operations in order to <br />become generally familiar with and to keep the Owner informed about the progress <br />and quality of tlrc work completed, endeavor to guard the Owner against defects and <br />deiicicncies in the work, and determine in general if the work is being performed in <br />accord�,rnce. with the contract documents. <br />aiul certi Py the amounts due to the contractor and issue certificates in such <br />• Rej ,_ t work flint does not conform to the contract documents. <br />Rev* -.,.v and approve or take appropriate action upon contractor submittals such as <br />shu;) �'.raw:ngs, product data and samples for checking for conformance with the <br />dcsir�ir concept expressed in the contract documents. <br />Ass;::l in preparations of change orders along with supporting documentation and <br />data. <br />Assist in project closeout. <br />