My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-035 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2019
>
2019-035 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2019 10:39:09 AM
Creation date
3/11/2019 4:38:47 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2019-035
Legislation Date
3/5/2019
Year
2019
Legislation Title
WHS Engineering Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Construction Administration — Scope of work includes coordination with architect for <br />services outlined on the attached proposal (see attached Exhibit 'B') as well as typical office <br />administration by WHS including review of shop drawing submittals by the contractor and <br />response to RFI's as necessary. WHS site observation and meetings include the fallowing: 1 <br />pre-bid meeting, 1 pre -const meeting, 2 site visits during construction and one punch list site <br />visit. <br />Base WHS Fee: $21,500 <br />Arch Consultant Fee: $14,300 <br />Total Fee: $35,800 <br />•.3 1 4 <br />`1. Not included in the above fees is the cost of reimbursable items such as plan review <br />fec s, permitting, printing, and deliveries. Estimated not to exceed cost of $2000. <br />2. Scope of work assumes no structural modifications will be required to the existing <br />building. If required, WHS can provide structural engineering as an additional service. <br />3. Construction administration limited to shop drawing review and answering BFI's as <br />wo,11 as limited site observation/meetings as outlined above. <br />4. ("NII, pluMbing and/or fire protection engineering design services are not included. <br />5. Specifications shall be included on the drawings in lieu of a book specification. <br />Our work v,lill begin after receipt of the signed Proposal. Thank you forthis opportunity. <br />Acceptcf !?y: <br />Willik_irn t 1. Si« Ix-udson, RE <br />Presideni, <br />WHS Engineering Inc. <br />Dave Demaline <br />Streets & Facilities Foreman <br />City of North Olmsted, OH <br />
The URL can be used to link to this page
Your browser does not support the video tag.