My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-90 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-90 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 3:32:32 PM
Creation date
5/22/2019 3:31:47 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-90
Legislation Title
Cleveland Water Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 1 <br />Allowable Water Items for CWD Reimbursement <br />• Installation of New Water Mains (various sizes) <br />• Clean & Line Water Mains (various sizes) <br />• Remove & Replace Existing Valve with New Valve <br />• Install New Cut -in Valves <br />• Installation of a Supplemental Connection (Connection between two Water Mains of <br />Various Sizes, typically a Transmission Main and a Local Distribution Main) <br />• Replace or Install New Fire Hydrant <br />• Replacement of Service Connections from Main to Curb Valve (all sizes / In R/W) <br />• Abandon Water Service Connection (all sizes, plugging of connections as per CWD <br />specification) <br />• Provide Temporary Water Mains and Service Connections <br />• Video Taping Services of Pipe Lining (inside pipe for Cleaning & Lining) <br />• Temporary Connections (house to house or building to building) <br />• Installation of Spool Pieces (used for removing tees, taps, hydrants, connections, main <br />abandonment) <br />• Preconstruction Video of right of way (on water only projects) <br />• As -built drawings (as per CWD specification) <br />• Flowable Fill or Granular Fill for Water Main Trench <br />• Pavement Restoration (including base and asphalt pavement not to exceed 12 feet in <br />total width) <br />• Cathodic protection (including Corrosivity Report, Electrical Bonding, Test Stations, as <br />specified by CWD) <br />• Allowance for fees <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.