Laserfiche WebLink
B. STATE <br />• ORC 153.65 through 153.71 <br />• ORC 5501.03(D) <br />• OAC 4733-35-05 <br />C. ODOT <br />• ODOT's Manual for Administration of Contracts for Professional Services <br />• ODOT's Specifications for Consulting Services — 2016 Edition <br />• ODOT's Consultant Prequalification Requirements and Procedures <br />• State of Ohio Department of Transportation Construction and Material <br />Specifications Manual <br />• State of Ohio Department of Transportation Construction Administration Manual of <br />Procedures <br />2.2 The LPA shall comply with all applicable Federal and State laws, regulations, executive orders, and <br />applicable ODOT manuals and guidelines. This obligation is in addition to compliance with any <br />law, regulation, or executive order specifically referenced in this Agreement. <br />3. FUNDING AND PAYMENT <br />3.1 The total cost for the PROJECT is estimated to be $ 2,126,950 as set forth in Attachment <br />1. ODOT shall provide to the LPA 80 percent of the eligible costs, up to a maximum of $1,480.000 <br />in Federal urban paving funds. This maximum amount reflects the funding limit for the PROJECT <br />set by the applicable Program Manager. Unless otherwise provided, funds through ODOT shall be <br />applied only to the eligible costs associated with the actual construction of the transportation project <br />improvements and construction engineering/inspection activities. <br />3.2 The LPA shall provide all other financial resources necessary to fully complete the PROJECT, <br />including all 100 percent Locally -funded work, and all cost overruns and contractor claims in excess <br />of the maximum(s) indicated in 3.1 above. <br />3.3 All funding from ODOT under this Agreement operates on a reimbursement basis. The LPA shall <br />review and/or approve all contractor invoices for materials, equipment and labor prior to payment <br />and prior to requesting reimbursement from ODOT for work performed on the PROJECT. <br />3.4 The LPA shall ensure the accuracy of any invoice in both amount and in relation to the progress <br />made on the PROJECT. The City of North Olmsted must submit to ODOT a written request for <br />reimbursement of the state share of the expenses involved, attaching copies of all source <br />documentation associated with pending invoices or paid costs. To assure prompt payment, the <br />measurement of quantities and the recording for payment should be performed on a daily basis as <br />the items of work are completed and accepted. <br />3.5 ODOT shall pay, or reimburse, the LPA or, at the request of the LPA and with concurrence of <br />ODOT, pay directly to the LPA's construction contractor ("Contractor"), the eligible items of expense <br />in accordance with the cost-sharing provisions of this Agreement. If the LPA requests to have the <br />Contractor paid directly, Attachment 2 to this Agreement shall be completed and submitted with the <br />project bid tabulations, and the Contractor shall be required to establish Electronic Funds Transfer <br />with the State of Ohio. ODOT shall pay the Contractor or reimburse the LPA within thirty (30) days <br />of receipt of the approved Contractor's invoice from the LPA. <br />3.6 The LPA shall certify in writing that the PROJECT was developed and delivered in compliance with <br />the terms, conditions and requirements of the PROJECT Agreement with his/her Professional <br />Engineer's seal and signature. The LPA shall then provide the final report to the ODOT District <br />within 6 months of the physical completion date of the PROJECT so that the report may be audited <br />Page 2 of 27 <br />Revision Date 3/26/2020 <br />