Laserfiche WebLink
(e) The Commissioner shall have the right to determine the size of all mains, <br />pipes, and service connections used for the supply of water hereunder; the same shall <br />conform to the requirements established by PURVEYOR within its own corporate limits <br />under similar circumstances. <br />(f) All mains twelve inches (12") or less in diameter and all service connections <br />shall be laid not less than six feet (6') below the established grade of the street or other <br />public way measured down to the top of mains or service connections. Mains sixteen <br />inches (16") in diameter shall be laid not less than five feet (5) below the established <br />grade. <br />ARTICLE 11. CONNECTION OF NEW DISTRIBUTION MAINS; <br />INSPECTION AND TESTING <br />11.01 PURVEYOR shall not be obligated to supply water service to any new <br />distribution water main constructed by MUNICIPALITY or a third party or Capital <br />Improvement constructed by MUNICIPALITY or a third party or any new service <br />connection unless and until all of the following provisions have been complied with: <br />(a) Before the installation of any main may proceed, MUNICIPALITY shall cause <br />a professional engineer to set the required line and grade stakes so that the main and <br />appurtenances are placed in the proper location and at the correct elevation. The cost <br />of such services shall be borne by MUNICIPALITY or other interested party. <br />(b) Parties seeking to install a new main shall notify Commissioner of the <br />intention to begin work on the installation of any water main at least three days prior to <br />such starting date. PURVEYOR shall have the right to inspect and test ally and all <br />materials used or to be used in the construction and installation of any part of the water <br />supply and distribution system within the corporate limits of MUNICIPALITY. The times <br />and method of inspection and testing shall be determined by the Commissioner. <br />MUNICIPALITY shall grant PURVEYOR access to all streets, public ways, all parts of the <br />water system and all other places where materials are located, or to areas work is to be <br />performed, and MUNICIPALITY shall cooperate with and inspection and testing performed <br />by PURVEYOR. <br />(c) All water mains shall be disinfected and chlorinated by PURVEYOR at the <br />expense of the party installing the main. The party installing the main shall give <br />Commissioner reasonable notice as to when the mains are ready for such work. The <br />process of disinfection and chlorination, and the rate of application shall be determined <br />by the Commissioner. <br />11 <br />