My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-090 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-090 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 3:59:25 PM
Creation date
2/19/2021 3:58:37 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-090
Legislation Title
Cleveland Water Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(d) All water mains shall be tested with hydraulic pressure by MUNICIPALITY <br />or other interested party at its expense under procedures for hydrostatic testing and the <br />pressure to be applied to be determined by the Commissioner. MUNICIPALITY shall cause <br />to be prepared and delivered to PURVEYOR record prints prior to final testing of the main. <br />11.02 Any work of inspection and testing pet -formed by PURVEYOR pursuant to <br />Section 11.01(b) above shall be at the expense of PURVEYOR provided, however, that if <br />such expense in the MUNICIPALITY shall become greater than the average expense for <br />Such services on behalf of other municipal users of the water system during a comparable <br />period, then in that event, PURVEYOR shall have the right to charge the party requesting <br />such services for all or a portion of the excess cost that is greater than the aver -age cost <br />in other municipalities. Such excess costs shall be paid within thirty (30) days from the <br />date of PURVEYOR'S bill for such services. All work of inspection and testing performed <br />by MUNICIPALITY shall be at the expense of the MUNICIPALITY. <br />ARTICLE 12. MAINTENANCE OF DISTRIBUTION MAINS <br />12.01 PURVEYOR shall be responsible for and shall bear the expense of the repair <br />and maintenance of all distribution mains and appurtenances, except as otherwise <br />provided herein. The cost of said repair and maintenance will be included as a part of <br />the water rate on a system wide basis. <br />ARTICLE 13. DAMAGE TO SYSTEM AND RELEASE OF LIABILITY <br />13.01 MUNICIPALITY agrees to make no claim against PURVEYOR on account of <br />any break or leak in any water main, or fire hydrant in any public street, highway or <br />easement which claim arises before PURVEYOR has notice of such leak and before <br />PURVEYOR has had a reasonable period of time to act after such notice is received to <br />cure any such condition. <br />13.02 MUNICIPALITY shall bear the cost of repairing water mains and set -vice <br />connections that may be damaged due to being embedded wholly or partly within a <br />sewer, manhole or catch basin. MUNICIPALITY shall save PURVEYOR harmless from any <br />claim for damages caused by a break in any water main, pipe or service connection that <br />results from the water main, pipe or service connection being embedded wholly or partly <br />within a sewer, manhole or catch basin in violation of regulations of any environmental <br />protection agency. <br />13.03 Repair and maintenance of new valve boxes, hydrants, distribution mains, <br />and service connections and their appurtenances installed by a contractor shall be the <br />obligation of MUNICIPALITY for a period of two years after completion, unless the <br />contract for such installation provides for such maintenance to be furnished by the <br />contractor or some other party. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.