Laserfiche WebLink
Council Minutes of 6-1-2021 <br />AUDIENCE PARTICIPATION <br />Jen Rudolph <br />3329 Walter Road <br />Ms. Rudolph said she wanted to convey her deep disappointment in the flyer she received <br />from the Mayor's campaign committee. She told the Mayor it disturbed her greatly that <br />instead of focusing on his accomplishments in his first communication for re-election he <br />attacked City Council on a decision that was made two to three years ago that did not go <br />his way. She said it was insulting to attack Council when some of them have supported <br />him for over 10 years and there are less than a handful of decisions that did not go his <br />way. She said she expected better. <br />The Mayor asked to respond. <br />Council President Jones reminded the Mayor this isn't a political debate, but a City <br />Council meeting. <br />The Mayor said he would refrain from commenting, but asked Ms. Rudolph to call him. <br />Jeff Sturgeon <br />3092 W. 231 <br />Mr. Sturgeon said Mr. Limpert said it was going to be three inches of asphalt <br />replacement. Mr. Sturgeon said he thought Elm Road was a concrete road, not asphalt. <br />He asked if the City planned to grind off three inches of concrete and replace it with three <br />inches of asphalt. <br />Director Lieber said it is a concrete street and it will be an overlay. She said there will be <br />no grinding, but there will be base repairs needed where the joints are separating. <br />Mr. Sturgeon thanked Director Lieber and said he is also happy to hear the Tractor <br />Supply Company is coming to his neighborhood. He said at the Planning Commission <br />meeting he brought it to their attention there was not a roof over their 2,000 gallon <br />propane storage tank and that State Codes required it. He said he saw that has been <br />changed. Mr. Sturgeon said at the time he was told the Fire Chief would be reviewing and <br />he asked if the Fire Chief had and if he had any comments regarding it. <br />Director Lieber said fire prevention is part of the plan review process and the Fire <br />Department has been involved in this project review since the initial submission and it <br />will be routed to the department before permits are issued. She said it will certainly be <br />reviewed for compliance by building code and state fire code. <br />Mr. Sturgeon asked if that meant he hasn't reviewed it yet, but that he would be. <br />Director Lieber said preliminary plans were reviewed, but the detailed construction <br />drawings have not been submitted for permit yet. She said at the planning stage they were <br />D <br />