Laserfiche WebLink
(t) Gas Piping -- <br />(1) Initial fee <br />(2) Plus per outlet <br />30.00 <br />10.00 <br />1321.02 HEATING, VENTILATING, AIR CONDITIONING, AND REFRIGERATION <br />PERMIT FEES. <br />The following fee schedule shall prevail for all heating, ventilating, air conditioning, and <br />refrigeration work to be performed. <br />a) All new or replacement residential I IV AC systems _ <br />(1) Residential heating or cooling system 60.00 <br />(2) Combination heating, and cooling system 80.00 <br />(b) For the installation of each overhead unit heater and each space heater (gas, <br />electric heaters or any fuel) including duct heaters <br />(1) Up to and including 75,000 BTU input 60.00 75.00 <br />(2) Replacement of all or part of baseboard heating _ 65.00 <br />(c) All new or replacement commercial HVAC systems <br />(1) Commercial heating or cooling unit <br />(2) Combination heating and cooling system, including package and <br />rooftop units <br />I Each additional installation after 3 <br />(3) Chiller, VAV, V VT, terminal and other mise. units, each <br />(d) Ductwork only <br />(1) Residential <br />(2) Commercial <br />(c) Refrigeration for storage or processing of food and beverage coolers, per unit <br />(f) Make-up air unit, per unit <br />(g) Gas infrared units <br />(h) New exhaust system for kitchen and cooking <br />space, including duct, hood, and filters, each <br />`mac <br />() Replacement Oe r,. ,,, St r,... <br />n Dm6....d <br />B. Eachadditionalunit <br />70.00 75_00 <br />399:90 <br />209.00 125.00 <br />25M <br />25.00 <br />35 00 50.00 <br />120.00 <br />40.00 <br />50.00 <br />35.00 <br />(i) Residential exhaust fans, to include bathroom exhaust Exhaust fans, each 3- <br />(1) Residential 30_00 <br />(2) Commercial 40,00 <br />